Installation Instructions
AF30-10
Required Crew: 2 Required
Concrete: 6-8, 80 lb. bags
Required Tools:
● Wheelbarrow
● Step Ladder (6’ or taller)
● Shovel
● Tape Measure
● Digging Bar or Pick
● Level
● Allen Wrench (Provided)
● Open end or Box Wrenches: 9/16”, ¾”
● Hammer or Mallet
● Ratchet Handle & Sockets: 9/16”, ¾”
● Marker Pen
● Drill: Cordless or electric, or impact driver
Component Playgrounds is concerned about the safety of your vision. It
is important that you choose to protect your vision by wearing proper
safety glasses during each and every phase of this construction
process.
PLEASE READ AND UNDERSTAND ALL INSTRUCTIONS BEFORE BEGINNING
The AF30-10 can be installed as a one day project. The normal time
required to install the AF30-10 is about 2-4 hours for a two man crew. This
time requirement will vary dependent upon the composition of the soil and
the speed of the installers. Mix and pour the concrete as the last step.
*Before digging, please obey local laws by notifying your local
underground utilities marking organization*
Summary of Contents for AF30-10
Page 2: ......