“Quick Install Guide”
Compex 16-Port All 10/100 Switch
DS2216
Version 1.2
ReadyLINK
Page 1: ...Quick Install Guide Compex 16 Port All 10 100 Switch DS2216 Version 1 2 ReadyLINK...
Page 2: ...13 14 15 16 DS2216 R Figure 1 Front Panel View of DS2216 Act Speed FDX Col Link Set Mode Power Priority 10 11 9 12 2 1 3 4 Trunking 100M Half 14 15 16 13 5 6 7 8 Default 12 9 10 11 7 8 Figure 2 Front...
Page 3: ...Full or Half Duplex mode 8 8 Advanced Configuration on Compex DS2216 9 How to force a certain port to 100Mbps speed and Half or Full duplex mode 9 How to force a certain port to 10Mbps speed and Half...
Page 4: ...an Version II Warranty Card for Russian Version III Warranty Card for French Version IV Technical Support for English Version TS 1 Technical Support for German Version TS 2 Technical Support for Russi...
Page 5: ...ectivity allowing for progressive migration Support Full Duplex and Half Duplex for both 10Base T and 100Base TX connection at each port Highly optimized flow control for full and half duplex evolved...
Page 6: ...Button Uplink mode when button is pushed IN Normal mode when button is released OUT 6 LINK ACT LED Select to view active ports link and activity status 7 Speed LED Select to view active ports connect...
Page 7: ...s Integration 16 high speed ports permit Ethernet workgroups to communicate with Fast Ethernet users in a single integrated network and share servers connected to the dedicated 100Mbps ports Port expa...
Page 8: ...negotiation or Forced Mode Link Distance 100Base TX Requires data grade Category 5 UTP cable Segment length can be up to a maximum of 100 meters on every port 10Base T Requires Category 3 4 and 5 UTP...
Page 9: ...Below list the installation steps 1 Unpack the unit 2 Choose a location near the devices to be connected and close to an electrical outlet Put the unit at a clean smooth level and sturdy place Make s...
Page 10: ...tion Button operations There are two buttons on Compex DS2216 panel Set and Mode They are for setting and resetting enhanced functions Two function groups namely Status LED group and Option Mode LED g...
Page 11: ...or about 3 seconds until the port LEDs flash once LEDs Status LEDs Link Act Display all active ports link and activity status Speed Display all active ports speed ON for 100Mbps OFF for 10Mbps FDX Col...
Page 12: ...ose ports LEDs that light up indicate that they are connect at 100Mbps speed Those that did not light up are either inactive or not connected If there are active ports but their LEDs did not light up...
Page 13: ...will jump to port select Port 1 LEDs lights up first Press the Set button again to jump to next port 2 Continue to press several times until the desired port LED lights up To set this port press the S...
Page 14: ...ode button several times until the Half LED lights up Check the LED for that port number you want to set If the port LED lights up it is already forced to Half Duplex mode Skip and go to step 2a Other...
Page 15: ...hts up To set this port press the Set button and hold it down for about 3 seconds until all ports LEDs flash once When successful this port LED will turn OFF Setup complete 100M LED Half LED Port Stat...
Page 16: ...ss connect MDIX Ensure the proper twisted wire pairs are connected to the correct RJ45 connector pins See the Appendix for correct wiring details Each cable can be up to a maximum of 100 meters long 3...
Page 17: ...se proceed to step 2 2 Now press the Set button once will jump to port select Continue to press Set button several times until the desired ports group LEDs lights up To set this ports group press the...
Page 18: ...h priority mode will arrive sooner at the destination MAC address 1 Press the Mode button several times until the Priority LED lights up Check the LED for that port number you want to set If the port...
Page 19: ...actory Default Setting The factory default setting of Compex DS2216 is No trunking Normal Priority each port runs in Auto Negotiation mode How to check which ports have been pre configured for what mo...
Page 20: ...light up check that Plug cord is properly inserted into the socket The ON OFF switch is turned ON If LINK ACT LED does not light up check that Wire pairs connected to RJ 45 plug are correct RJ 45 plu...
Page 21: ...ry to correct the interference by one or more of the following measures Reorient or relocate the receiving antenna Connect the computer into an outlet on a circuit different from that to which the rec...
Page 22: ...hich this product is installed Model Serial No TCP IP IPX ODI XNS OST DLC DECnet Network protocol Check all that apply NDIS SNA NBP Other Novell NetWare 3 X 4 X 5 X SCO Unix Openserver Ver Microsoft W...
Page 23: ...bert Einstein Stra e 34 M21 63322 R dermark Germany Tel Fax BBS 49 0 6074 98017 8 a m 5 p m local time 49 0 6074 90668 49 0 6074 93974 24 hour access Call Support Email readylink compex com sg Asia Au...
Page 24: ...Manual Number M 0313 V1 2C M 0313 V1 2G M 0313 V1 2R M 0313 V1 2F Version 1 2 May 2002...