Connecting Dependent racks
The panel bus installed in the adjacent rack to the right of the imVision Controller X must be connected to the connector
marked
and the panel bus installed on the adjacent rack to the left must be connected to the connector marked
. The
O connector will have a panel bus jumper already connected to it and it will connect to the panel bus installed in the rack
the imVision Controller X is installed in.
When correctly connected, the arrow symbols above the panel bus connectors on the back of the imVision Controller X
should point toward the dependent racks to which each connector is connected.
Ordering Dependent Racks
When the system first detects an extender panel bus cable plugged into a
or
connector on the rear of the imVision
Controller X base, a screen will appear to identify the numeric order of the racks managed by the imVision Controller X.
Press
Change Rack Order
to toggle whether the highest rack number is on the left or right. After initial configuration, or if
the screen times out, this screen can be shown again using the
Configure Rack Order
option from the
Tools
menu.
After selecting the correct rack numbering, press
Save
to set the rack numbering.
Note: The
or
will always point to the physical rack/cabinet on the left or right as viewed from the display.