PANEL INSTALLATION
4.1
Overview
The SYSTIMAX EHD Panel is shipped on a spool, preterminated with 144 LC
connectors per rack unit (RU). It is available in both left- and right-cable-entry versions.
A blocking kit is provided for the purpose of splicing the provided cable into a splice bay
such as the OMX.
After mounting, the panel must be grounded. Use a #2 Phillips Screwdriver to tighten
the M4 screws through the ground lug (provided) into the panel ground PEM nuts, as
described in
. Ground cables are NOT provided with the panel.
4.2
Tools and Hardware Needed
Use a #2 Phillips Screwdriver and the supplied #12-24 screws to secure the panel to
the equipment rack.
4.3
Mounting an Unloaded Panel
The panel is to be installed in a 19-inch (482.6mm) equipment rack with a 3-inch or 5-
inch channel. Use the following procedure to mount the 1RU/2RU panel.
1. Obtain the following tools and equipment:
• Phillips #2 screwdriver;
• Mounting hardware provided.
2. Determine whether the panel will be installed on front or rear and whether on a 3-
inch or 5-inch channel. Install the mounting brackets provided in the locations
shown in the following figures (which are representative of other RU sizes, also):
•
for 2RU mounting on a 5-inch channel;
•
for 2RU mounting on a 3-inch channel;
•
for 1RU mounting on a 5-inch channel; or
•
for 1RU mounting on 3-inch channel.
Caution: This equipment is to be installed only in Restricted Access Areas (dedicated
equipment rooms, equipment closets, etc.) in accordance with Articles 110-16, 110-17,
and 110-18 of the National Electrical Code, ANSI/NFPA 70.
Note:
The panel is shipped with the mounting brackets already installed in the
front position. If a rear position is desired, remove the brackets and install them in
the rear position.