![CommScope OneCell RP5100i Hardware Installation And Commissioning Download Page 38](http://html1.mh-extra.com/html/commscope/onecell-rp5100i/onecell-rp5100i_hardware-installation-and-commissioning_2643756038.webp)
Chapter 4
RP5100i installation
4-2
913035 4.0.04 June 2019
D
R
A
F
T
RP5100i installation overview
The RP5100i is the Radio Point for indoor solutions.
There are four configurations for installing the RP5100i, which are dependent on the
ceiling type.
•
Ceiling mount, on tile
•
Ceiling mount, above tile
•
Flown mount
•
Pole mount
NOTE
Once the Radio Point is installed and powered on, it may take up to 20 minutes for
the frequency to stabilize and lock.
Ceiling mount
Mounting the Radio Point (RP) above or on the ceiling tile requires the following
hardware provided by CommScope:
•
Radio Point plate and screws
•
4" octagon box, 1-1/2" deep with 1/2" side cutouts
•
Clamp and screw
Figure 4-1.
CommScope ceiling mount kit contents
Octagon
box
Clamp with
1 screw
Mounting plate for
octagon box with 2
screws
Mounting plate for RP
with 4 screws
Summary of Contents for OneCell RP5100i
Page 7: ...Contents OneCell Installation and Commissioning RP5000 series Release 4 0 vii DRAFT ...
Page 10: ...List of tables x 913035 4 0 04 June 2019 DRAFT ...
Page 12: ...Document revision history xii 913035 4 0 04 June 2019 DRAFT ...
Page 18: ...About this document xviii 913035 4 0 04 June 2019 DRAFT ...
Page 20: ...DRAFT ...
Page 28: ...DRAFT ...
Page 68: ...Chapter 4 RP5100i installation 4 32 913035 4 0 04 June 2019 DRAFT Installation is complete ...
Page 69: ...DRAFT Part III Commissioning Chapter 5 Configuring the OneCell system ...
Page 70: ...DRAFT ...