Table 6-1. OneCell Baseband Controller operational status
Case
Status LED
RP ERR LED
TIMING LED
CORE LED
Powered On
Green, solid (3 Sec)
Green, solid (3 Sec)
Green, solid (3 Sec)
Green, solid (3 Sec)
Internet - Yes
Green, solid
OFF
Green, solid
Green, solid
IPsec - Yes
Timing - Yes
Config from DMS - Yes
Remotes connected - Yes
Connection to MME - Yes
Sectors UP - Yes
Chapter 6
Verifying the OneCell installation
OneCell
®
Installation and Commissioning, RP5000 series, Release 4.0
6-3
D
R
A
F
T
Verify the Baseband Controller installation
Once the BC reboot is complete, log into the WebGUI to display the Management
Mode Dashboard.
Check the following information on the Dashboard:
•
Device Information
•
Timing Source Status
•
Radio Points Status
•
Service Status
•
CA Server Configuration
Summary of Contents for OneCell RP5100i
Page 7: ...Contents OneCell Installation and Commissioning RP5000 series Release 4 0 vii DRAFT ...
Page 10: ...List of tables x 913035 4 0 04 June 2019 DRAFT ...
Page 12: ...Document revision history xii 913035 4 0 04 June 2019 DRAFT ...
Page 18: ...About this document xviii 913035 4 0 04 June 2019 DRAFT ...
Page 20: ...DRAFT ...
Page 28: ...DRAFT ...
Page 68: ...Chapter 4 RP5100i installation 4 32 913035 4 0 04 June 2019 DRAFT Installation is complete ...
Page 69: ...DRAFT Part III Commissioning Chapter 5 Configuring the OneCell system ...
Page 70: ...DRAFT ...