6�3
Feeder/ Drop cable preparation,
routing and splicing at tray 2
For the feeder cable preparation see section 6.1.
6.3.1
Store all loops at the feeder site as shown.
6.3.2
Connect tray 2 to tray 1.
6.3.3
Install the splice holders in tray 2.
6.2.4
Remove the outer jacket of the bundles at approx.
100 mm/4 inches from jacket end. Cut the feeder fibers at the
opposite site from the drops. In case this is not possible route
the drops to opposite site.
6.2.5
Clean the fibers, make fusion splice and store the
fiber overlength properly, make sure that the fibers are rout
-
ed within the wire saddles.