6
Installation (continued)
5
Attaching the mounting strap to
the outlet box
6
Determining the correct length
of the chain
□
Screw nipple B (GG) into the screw collar loop
(II).
□
Screw nipple B (GG) a half-inch into the
mounting strap (CC).
□
Tighten the hex nut (FF) against the mounting
strap (CC) to secure nipple B (GG).
□
Attach the mounting strap (CC) to the outlet
box using the outlet box screws (EE).
□
Adjust the chain (JJ) to the required height
by using pliers and a screwdriver to twist
open (cover the chain with cloth to prevent
damage to the link finish) the link of the chain
(JJ) attached to the loop (A), lifting the fixture
and attaching it to a link closer to the ceiling.
□
To avoid damage to the link, only open the
link enough to hook it onto another link.
□
The fixture can be raised and lowered in this
manner until the desired height is achieved.
□
Use pliers and a screwdriver to twist open
(cover the chain with cloth to prevent
damage to the link finish) the first unused
link of the chain (JJ). Remove and save the
excess chain.
7
Connecting the electrical wires
□
Weave the fixture wires up through the chain
(JJ), through the ring (HH), through the screw
collar loop (II), through the canopy (AA), and
through nipple B (GG).
□
Wrap the ground wire from the fixture around
the ground screw (DD) on the mounting strap
(CC).
□
Connect the ground wire from the fixture to the
ground wire from the outlet box.
□
Connect the wire without writing on it (with
raised ribs) from the fixture to the white wire
(neutral) wire from the outlet box.
□
Connect the wire with writing on it from the
fixture to the black wire (live wire) from the
outlet box.
□
Cover the three wire connections using the wire
connectors (BB).
□
Wrap the three wire connections with electrical
tape for a more secure connection.
□
Position the wires back inside the outlet box.
JJ
A
CC
GG
II
FF
EE
BB
CC
DD
GG
II
AA
HH
JJ