7 HOMEDEPOT.com
Please contact 1-877-527-0313 for further assistance.
Conduit Installation (continued)
2
Connecting the back-up
battery
□
Connect the PCB board connector to the
battery connector.
NOTE:
The battery will take 24 hours to fully charge.
3
Assembling the fixture
□
Align the locking tabs and push the housing (A)
directly onto the backplate (B).
□
Restore power to the fixture. The Test switch (C)
should illuminate.
A
B
C
Maintenance
NOTE:
National Electric Code (NEC) and NFPA life safety code
regulations require that routine tests need to be performed.
□
Allow the battery to charge at least 24 hours before testing.
□
To test the fixture, press the TEST button. The LED lamps should turn on.
□
Test the fixture regularly.
CAUTION:
Always turn off AC power to the fixture before
servicing. Service should be performed only by qualified
personnel.
TESTING THE BATTERY:
Test the unit’s battery once per month. Additionally, every 12 months, a full 90-minute test should be performed.
While disconnected from the main power supply, the unit should illuminate for a minimum of 90 minutes on battery
back up power.