
9
EN
Contents
Contents......................................................................................................................................... 9
1. Introduction ............................................................................................................................. 10
2. Product description ................................................................................................................. 10
3. Warnings.................................................................................................................................. 10
4. Handling and unpacking ......................................................................................................... 11
4.1 Delivery of the packaged product .......................................................................................... 11
4.2 Handling ............................................................................................................................... 11
4.3 Unpacking ............................................................................................................................ 12
4.4 Dimensions and names of the parts ....................................................................................... 12
4.5 Equipment identification......................................................................................................... 13
5. Installation............................................................................................................................... 14
5.1 Installation............................................................................................................................. 14
A. Mechanical configurations ................................................................................................... 14
B. Front panel.......................................................................................................................... 15
5.2 Connections.......................................................................................................................... 17
A. Connection of the cc Talk version (Giochi Italia and Full) ....................................................... 17
B. Connection of the cc Talk version with separator (Game Italy and Full) .................................. 18
C. Connection of the parallel validator version .......................................................................... 18
D. Connection of the parallel validator version with separator .................................................... 19
E. Connection of the Totalizer version....................................................................................... 20
F. Connection of the Totalizer version with separator ................................................................ 20
G. Connection of the Virtual Dip Switch.................................................................................... 21
H. Connection to a PC............................................................................................................. 22
I. CN3 USB connector (optional) .............................................................................................. 23
L. LED..................................................................................................................................... 23
6. Settings.................................................................................................................................... 23
6.1. Configuration........................................................................................................................ 23
A. Configuration by means of VIRTUAL DIP SWITCH (optional) ................................................. 23
B. Configuration by means of Multiconfig programme............................................................... 24
6.2. Types of Configuration.......................................................................................................... 25
A. ccTalk validator configuration............................................................................................... 25
B. Spagna validator configuration............................................................................................. 29
C. Binary validator configuration............................................................................................... 29
D. Confida binary validator configuration .................................................................................. 30
7. Care and maintenance ............................................................................................................ 31
7.1 Maintenance and external cleaning ........................................................................................ 31
7.2 Maintenance and internal cleaning ......................................................................................... 32
8. Diagnosis and technical assistance ....................................................................................... 32
9. Technical data ......................................................................................................................... 33
10. Annexes ................................................................................................................................. 34
10.1 Decommissioning and disposal............................................................................................ 34
Summary of Contents for RM5 HD
Page 2: ......
Page 16: ...RM5 HD Operating Manual 16 Fig 6 B 2 Front panel F6 Fig 7...
Page 37: ...37 EN...
Page 38: ...RM5 HD Operating Manual 38...
Page 39: ...39 EN...