10
C. Installation Procedures
1. This equipment must be installed in accordance with the directives of PREN50178 and
EN60208-1 / IEC-208-1.
2. This equipment is qualified to operate at pollution degree II and installation category II.
3. This equipment is intended to be powered from a 208VAC, 3 Phase source. For use at
other voltages, a safety isolation transformer must be used to power this equipment in
accordance with the directives of EN60742 / IEC-742.
4. The installation of this equipment must assure that the AC power connector (UL/CSA) is
not accessible to the user/operator. Access may be gained only by a qualified service
technician.
5. Customer supplied AC mains connector installation to be in accordance with local
requirements
CAUTION:
There are no user serviceable parts inside this equipment. Refer all service to a qualified
service technician.
VI. Operating Instructions
Operating and monitoring the CPS-1001 generator is accomplished either locally at the front panel or
remotely. A front panel toggle switch selects either local or remote control. The remote monitoring and
control interface is handled through the rear panel mounted 15-pin female “D” type connector, called J1.
A. Local Operation
1. Install 50 ohm coaxial load to output terminal of generator. Attach interlock sleeve on
output cable to capture output cable interlock. The generator is normally supplied with
Type N coaxial connectors. RG-8/u cable is sufficient to carry the output power from
generator to load. Load should have at least 1500W dissipation rating.
2. Pin 11 or rear panel connector J1 must be grounded to enable the main power contactor
(Pin 12 is ground). Pin 4 of rear panel connector J1 must be connected to Pin 9 (RF
enable).
3. With the front panel circuit breaker in the “OFF” position, attach the primary supply line
to the appropriate supply mains.
NOTE:
Units are shipped wired for 208V, 3 phase, 50/60 Hz unless specified by
customer.
4. Place local/remote switch in “LOCAL” position.
5. Rotate power control knob fully counter-clockwise.
6. Check that cooling water is on.
7. Check to confirm that all cover and cable interlocks are satisfied.
8. Turn on the front panel circuit power breaker.
9. Turn power control knob clockwise until full power is indicated on front panel power
meter. (Reflected power will not indicate.)