IGS-NT-BC, SW Version 1.2.0,
©ComAp – January 2019
IGS-NT-BC-1.2.0 Reference Guide.PDF
99
Setpoint: Batt volt del
Group
Analog protect
Range [units]
0 .. 600 [s]
Related FW
3.0
Description
This setpoint adjusts the delay for battery
Group: Bank protect
Setpoint: Min Power PtM
Group
Bank protect
Range [units]
1 .. 100 [%]
Related FW
3.0
Force value
possible
YES
Description
This setpoint is used for adjusting of the lower limit of the requested gen-set
power in parallel to the mains operation. If the requested load (given by the active
load control mode, e.g. Baseload, Import/Export etc.) is below this limit the
requested load is limited to the level adjusted by this setpoint.
The only situation, where the
Min Power PtM
is ignored, is the warming procedure
after the gen-set is synchronized to the mains, i.e. the
Warming load
can be
adjusted also below the sepoint
Min Power PtM
.
This setpoint is also used as the requested load level if a protection of
Low power
type is active.
N
OTE
:
Note that if InteliMains is used and it is in active control mode (i.e. the
is set to LDSHARING) this setpoint is not considered and minimal power in
parallel to Mains operation is given by
ProcessControlMinPwr PtM
is used to
determine minimal power of each gen-set in the group in percentage of its nominal
power.
Setpoint: Ishort
Group
Bank protect
Range [units]
100 .. 500 [%]
Related FW
3.0
Description
This setpoint adjusts the threshold level (in % of the
) for the
generator fast overcurent protection. The protection is activated (alarm
Ishort
is
issued) when the generator current in at least one phase exceeds the threshold
limit for time longer than
N
OTE
:
The protection type is
Breaker open and cool down
(BOC).