Coffee Crafters -| Assembly and Installation
14
Installing Conduit and Cord Routing
ITEM#
PART#
DESCRIPTION
QTY
1
A9-RBA-0000
ROASTER BODY ASSEMBLY
1
2
A9-HSM-1200
DISTRIBUTION BOX COVER
1
3
8-32 X 3/8" SCREW
-
2
1.
The hood light cord contains 2 pass through connectors. Slide the bottom connector down to the
bottom hole location (Detail B) and secure the top connector to the top hole location (Detail A).
Gently pull the slack through the pass throughs and plug the cord into the back of the roaster. You
will find the plug socket below the louvers to the right facing the back of the roaster.
2.
Install the electrical cord or rigid conduit to the power distribution block on the back of the
roaster. The photo insert shows an electrical pigtail installed. For rigid conduit connection remove
the cord grip and install the proper conduit connector.
Note: We recommend installing a pigtail and plug to ease in moving the roaster for cleaning.