Instructions to assemble and install
Edition E0
Page 49 of 69
Confidential and Property of CoeLux S.r.l.
6.2.17
STEP 16: assembly of fixing kit
Use the M8 bolts supplied in the kit to fasten the 4 plates 73-00152-01 and the 2 horizontal tie
rods 73-00155-01 (Figure 50).
Fig. 50
Anchor system - View from below
6.2.18
STEP 17
WARNING!
You must never take or hang the box through the fold in the sheet metal!
Take special care not to scratch the CoeLux® panel or break the mirrors when lifting and
positioning.
Use adequate lifting systems for the work load (approximately 300 kg) to lift the 45 HC products.
While it is being lifted, the box must rest on at least three different points. Make sure it is as
horizontal as possible and is not subjected to sudden movements.
The resting points for lifting must be those marked with a blue icon with white writing
(“Compliance with the lifting points is mandatory”) in Figure 51.
Raise the equipment approximately 180 cm from the ground. Take the sub-group assembled in
Step 3, remove the film from the top of the CoeLux® panel [6] and clean the surface in two stages:
Stage 1 (wet): wet the entire surface thoroughly with a cotton cloth and the dust collector (both
supplied in the cleaning kit).
2
228 (8
7
.7)
2391
(
94
.1)
2308
(
90
.9)
2660 (104.7)
100 (3.94)
2580 (101.6)
80 (3.15)
80 (3.15)
841 (33.1)
1196
(
47
.1)