Installation of the ADU
3-16
Chapter 3: Installation
98-148248-A
Lifting Harness – Declaration of Conformity
The lifting harness (Cobham SATCOM part number TT 48-149056) is designed, tested and
conforms to the requirements for lifting equipment in DIRECTIVE 2006/42/EC OF THE
EUROPEAN PARLIAMENT AND OF THE COUNCIL of 17 May 2006 on machinery, and
amending Directive 95/16/EC (recast).
The Working Load Limit (WLL) is defined as 40 kg. The harness may only be used for lifting
the ADU.
3.3.2
To install the ADU
Prerequisites
• Check for potential interference, read more in
Interference from radar, GPS and other
• Install the ADU at a location where
vibrations are limited to a minimum
.
• Maximum allowed cable loss
20 dB at 1950 MHz. This is to ensure optimum
performance of the system.
• Ensure that the crane hook has a closing mechanism to prevent accidental slippage of
the lifting straps.
Installation procedure
To install the ADU, do as follows:
1. Install the mast with the mast flange and have the 4 M10 bolts ready.
2. Open the ADU cardboard packaging.
3. Remove the foam protection layer at the top.
4. Take the 4 lifting straps and connect them to the crane hook.
SAILOR600Ka-IM-98-148248.book Page 16 Monday, November 23, 2015 1:36 PM