![COBHAM 407006D-00500 Installation And Operation Manual Download Page 38](http://html1.mh-extra.com/html/cobham/407006d-00500/407006d-00500_installation-and-operation-manual_2629886038.webp)
Installation of the ADU
3-18
Chapter 3: Installation
98-166784-A
3.3.3
To install the ADU
Prerequisites
• It is important to maintain
vertical orientation of the ADU center line
.
• Maximum allowed cable loss
20 dB at 1675 MHz. This is to ensure optimum
performance of the system.
Installation procedure
To install the ADU, do as follows:
1. Install the mast with the mast flange and have the 4 M10 bolts ready.
2. Open the ADU cardboard packaging.
3. Remove the foam protection layer at the top.
4. Take the 4 lifting straps and connect them to the crane hook.
Figure 3-16: ADU installation, 4 lifting straps on crane hook