![Cloos NexT 452 AC Operating Instructions Manual Download Page 39](http://html1.mh-extra.com/html/cloos/next-452-ac/next-452-ac_operating-instructions-manual_2625802039.webp)
39
3. MAIN - Operating modes
The welding power source provides the following operating modes:
• 2-cycle
• 4-cycle
• Super-4-cycle
• Spot welding/Interval
• External
3.1 2-cycle
Operating mode 2-cycle is provided for short manual welds.
1st cycle --> Press torch trigger
• Solenoid valve for shielding gas opens
• Welding voltage is applied on wire electrode
• Wire drive unit starts with reduced speed (inching-in)
• Arc ignites, welding current flows
• Wire drive unit switches to the preset wire speed
2nd cycle --> Release torch trigger
• Wire drive unit stops
• Welding voltage is switched off after expiration of the "burnback time"
• Arc extinguishes
• Solenoid valve closes after expiration of the "gas post-flow time"
3.2 4-cycle
Operating mode 4-cycle is provided for longer manual welds.
1st cycle --> Press torch trigger
• Solenoid valve for shielding gas opens
• Welding voltage is applied on wire electrode
• Wire drive unit starts with reduced speed (inching-in)
• Arc ignites, welding current flows
• Wire drive unit switches to the preset wire speed
2nd cycle --> Release torch trigger
• Execution of start program and upslope, if required
• Welding process continues with the adjusted main parameters
3rd cycle --> Press torch trigger again
• Downslope and end crater program, if required
4th cycle --> Release torch trigger again
• Wire drive unit stops
• Welding voltage is switched off after expiration of the "burnback time"
• Arc extinguishes
• Solenoid valve closes after expiration of the "gas post-flow time"
Summary of Contents for NexT 452 AC
Page 4: ......
Page 11: ...11 Block 1 Operational Safety...
Page 27: ...27 Block 2 Basic information Qineo NexT...
Page 110: ...110 Job mode...
Page 148: ...148...
Page 149: ...149 Block 4 Additional information...
Page 164: ...164 SD module...
Page 191: ...191 Block 6a Error messages...
Page 207: ...207 Block 6b General maintenance instructions...
Page 212: ...212...
Page 213: ...213 Block 7 Automation...
Page 232: ...232...
Page 233: ...233...
Page 234: ...www qineo de...