Air Handling Unit
Installation, Operation, and Maintenance Manual
April 2021
Receiving/Startup Report
Job Name:
Unit Serial Number:
Receiving Date:
Startup Date:
A Receiving/Startup Report must be submitted for each unit on the job. For warranty purposes, startup occurs when
the air handling unit is started for operation, regardless of whether the building is occupied.
Receiving:
1. Inspect unit for shipping and/or installation damage.
2. Check Bill of Lading against material received.
3. Verify all packing material has been removed from unit.
4. Unit acceptance at first delivery point.
5. Unit acceptance at jobsite.
Assembly:
1. Locate all loose parts shipped with unit and verify against Loose Parts List.
2. Inspect unit demount splits (if applicable) for proper reassembly.
3. Ensure all gasket is positioned in accordance with ClimateCraft IOM.
Pre-Startup:
1. Remove shipping lock-down bolts as described in ClimateCraft IOM.
2. Manually rotate fans to ensure freedom of movement.
3. Verify condensate drain traps are properly installed as per ClimateCraft IOM.
4. Inspect lighting circuit.
5. Verify filter installation.
6. Clean inside of unit of all construction dirt and debris.
7. Adjust access doors for proper alignment as required in accordance with ClimateCraft IOM.
Operational Check:
WARNING! DO NOT OPERATE UNIT IS SYSTEM IS NOT PROPERLY BALANCED.
1. Check damper operation to ensure freedom of movement.
(Disconnect actuator or use manual release)
2. Momentarily start fan motor(s) to ensure correct rotation.
3. Check belts for tightness if applicable.
4. Perform VFD startup (if equipped) in accordance with VFD mfg’s instructions.
(To be performed by authorized VFD startup personnel)
5. Complete VFD startup form to include all required readings.
6. During Test & Balance, record unit External Static Pressure (ESP) and Total Static Pressure (TSP).
7. During Test & Balance, record unit Supply and Return CFM.
8. During Test & Balance, verify unit is operating at design conditions.
9. While unit is in operation, verify no excess standing water is present in drain pan..
10. After 24 hours of operation, re-check set screws on bearing collar and fan hub for tightness.
Startup Performed by:
Date:
FCD-0025 Rev. G
1427 NW 3rd Street, Oklahoma City, Oklahoma 73106, (405) 415-9230, Fax (405) 415-9231
Date
Completed