
14
Installation
STEP 1 UNPACKING
1.
Us
e
a forklift and chain to move the lift to desired
location
(Fig. 3).
2.
Unpack the package. Check the accessories and spare parts.
3.
Position the platforms according to the data in Fig1 (Fig. 4).
Fig. 3
Fig. 4
STEP 2 PUMP SETTING UP
1.
Remove
the control box a
nd stand
from its
package
.
2.
To open the control unit cover, push the left part
of the lock to left, the lever will pop-up. (Fig.5)
3.
Turn the lever 90 degree clockwise to open the
lock. (Fig.5)
4.
Fig. 5
5.
Screw on the valve kit (Fig.7).
6.
Mount
the motor pum
p on the stand
.
(Fig.8)
Fig. 6
Fig. 7
Fig. 8
Mount the box on the stand (Fig. 6).
REV A-082913