4. Installation Instructions
4.1 Pole Installation
Solution 1
:
Pole pre-buried
Dig a hole with the diameter
300~500mm, depth 1300~1800mm.
Cover the bottom of the hole with 50-
70mm gravel.
Place the pole into the middle of the
hole and fill it with concrete. Maintain
the position of the post to an allowed
vertical tolerance of ±2°. Axis of 2- Ø 22
hole is parallel to west, angle tolerance
is within±5°, and 2- Ø 22 holes direction
of all poles is consistent.
.
Solution 2 : Flange based pole
Secure the Flange based Pole to the
concrete foundation with M20
foundation bolts. Axis of 2- Ø 22 hole is
parallel to west, angle tolerance is
within±5°, and 2- Ø 22 holes direction
of all poles is consistent.
Recommended Torque:
M20: 215~220Nm
Cement mortar
Gravel