4 Installation
4.1 Requirements
⇒
Closed room with normal working conditions (temperature
> 15°C
,
relative humidity < 85%).
⇒
Solid level site.
⇒
Sufficient space for loading parts
−
Behind the cabinet minimum
80cm
are necessary for emptying the dust container.
−
In front of the cabinet minimum
80cm
for the operator.
⇒
Ensure sufficient illumination, even behind the cabinet.
⇒
Electrical service:
−
400V 3-phase, capacity 0,55kW
−
16
socket
(CEE socket)
⇒
Air requirements see table 1.
orifice [mm]
Nozzle
Nr.
Air requirement [m
3
/min.] at
Working pressure [bar]
Air jet
Blast nozzle
3
5,5
7
3,2
6,0
4
0,4
0,6
0,75
4,0
8,0
5
0,6
0,9
1,25
Table 1
Air requirements versus nozzle size and pressure.
4.2 Set-up for initial installation or reinstallation
When shipped, standard cabinets are ready for operation, thus only the following has to be done.
(1) Place the cabinet.
See also section 4.1 Requirements.
(2) Install an air supply.
−
Check pressure at compressed air supply. If pressure is > 7 bar, install
both an additional pressure regulator and a pressure relief valve (adapted
to air supply) between cabinet and air supply as the standard cabinet is
designed for a
maximum pressure
of
7 bars
.
−
Attach an air hose with corresponding length and diameter on air supply.
−
Carefully open the air supply (hold hose tight) to blow debris and moisture
out of the attached hose.
−
Close air-supply.
−
Attach air hose on cabinet (coupling on the rear side of the cabinet)
−
Adjust pressure regulator (rear side) for the dust collector cartridge clean-
ing pulse at 5 bars.
(3) Install electrical connec-
tion and earth screw.
If the plug is not used for the electrical connection or there is no plug, then
the work must be performed by a qualified licensed electrician.
Summary of Contents for Pulsar II
Page 20: ...20 7 Replacement parts 7 1 Individual replacement parts for cabinet ...
Page 21: ...21 ...
Page 22: ...22 Picture 5 Individual parts cabinet ...
Page 28: ...28 8 Cabinet wiring 400V 0 55kW ...
Page 29: ...29 ...