Chapter 4 — Operation
4-2
Part No. 750-386
4.1-System Monitoring and Operation
4.1.1 - Screen Select
On system power-up, the Main Menu will be displayed. This screen
allows access to all of the primary control, monitoring, and
configuration sections of the ADAC system.
Graphic displays of the DA system are accessed by pressing <Tank
Overview> (single tank systems) or <DA [Surge] Tank Overview>
(two tank systems).
4.1.2 - DA Tank Overview
The Overview screen(s) allow the operator to monitor device status
and certain data critical to system operation.
On-screen indication is provided for the following:
Figure 4-1 Main Menu
Figure 4-2 DA Tank Overview Screen
Summary of Contents for ADAC 1000
Page 1: ...750 386 05 2017 ADAC 1000 Deaerator Control Operation Manual...
Page 22: ...Chapter 2 System Components 2 12 Part No 750 386...
Page 92: ...Chapter 5 Input Output Lists 5 6 Part No 750 386...
Page 93: ...www cleaverbrooks com Chapter 6 Parts Parts List 6 2...
Page 120: ...A 26 Part No 750 386...
Page 128: ...APPENDIX B ADAC 1000 ProtoNode Tags B 8 Part No 750 386...
Page 132: ...APPENDIX C Loading a PLC Program C 4 Part No 750 386...
Page 138: ...APPENDIX D Deaerator Reference Drawings D 6 Part No 750 386 Duo Tank Components typical...
Page 139: ......
Page 140: ...e mail info cleaverbrooks com Web Address http www cleaverbrooks com...