background image

 
 
 
 

Storage Master 

 

Shed Row 

 

Poly Buildings 

 

Instructions Manual 

 

Building #104598 

 
 
 
     
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

©2005 ClearSpan™ 
All rights reserved.  Reproduction prohibited without permission. 
Rev: 24 February 2005

 

 

Summary of Contents for Storage Master 104598

Page 1: ...Storage Master Shed Row Poly Buildings Instructions Manual Building 104598 2005 ClearSpan All rights reserved Reproduction prohibited without permission Rev 24 February 2005 ...

Page 2: ...5 166S099 1 66 PIPE SWAGED QUANTITY 18 131P0255 1 315 PIPE PLAIN QUANTITY 2 166P012 1 66 PIPE PLAIN QUANTITY 18 166P096D 1 66 PIPE LAIN QUANTITY 14 166P094 1 66 PIPE PLAIN QUANTITY 4 131S075 1 315 PIPE SWAGED QUANTITY 12 P 131P0735 1 315 PIPE PLAIN QUANTITY 2 131P0255 1 315 PIPE PLAIN QUANTITY 2 102675 3 X 1 900 GROUND POST QUANTITY 14 166S099 1 66 PIPE SWAGED QUANTITY 18 166P046 1 66 PIPE PLAIN Q...

Page 3: ...ure rafter leg with supplied hex bolt and nut Be sure to leave holes 2 and 3 high enough off ground level in order to place a 2 x 6 ribbon board along building base if your construction plans include this addition Check ground posts so that holes are pointed outward Hole 4 is unused See Figure A ...

Page 4: ...4 Step Two End Wall Rafter Parts needed 3 x 102193 3 way coupler W eyebolts 2 x Leg Pipe 94 2 x Rafter Pipe 99 2 x Rafter Pipe 12 Eyebolt Detail ...

Page 5: ...after assembly Parts needed 2 x 102194 4 way coupler W eyebolts 2 x Rafter Pipe 99 2 x Rafter Pipe 12 2 x Hip Rafter Pipe 46 1 x Side Tee Fitting See Figure B 1 x Front Header Pipe 94 Swaged End 1 x Leg Pipe 94 Side Tee Figure B ...

Page 6: ...6 Step Four Mid Rafter Assembly 3 x 102194 4 way coupler W eyebolts 2 x Rafter Pipe 99 2 x Rafter Pipe 12 4 x Hip Rafter Pipe 46 2 x Leg Pipe 94 ...

Page 7: ...7 Step Five Finish rafter and end wall assembly by repeating steps 4 2 in descending order until cold frame assembly is complete ...

Page 8: ...8 Step Six Ratchet Assembly Front Setup Back Setup Ratchets are place on outside of building just about ground post assemblies Figure C shows locations for all ratchets ...

Page 9: ...9 Ratchet Location Figure C Ratchet Locations ...

Page 10: ...sed for purlin is 1 315 in diameter Side panel pipe per side 2 x 75 swaged 1 x 73 5 plain Pipe Fastening After fastening pipe with a Tek screw be sure to Cover it with supplied duct tape so the screw won t rip any fabric Side panel pipe locations ...

Page 11: ...11 Cover Conduit Pipe Pipe needed per side 1 315 5 x 75 swaged 1 x 25 5 plain These pipe make up the 16 front and back cover conduit pipe Cover conduit locations ...

Page 12: ...ly CC6213 FABRIC CLIP CC4595 TIE DOWN 8 SNUGGER BALL Step Two End panel walls will be held on by fabric clips and 8 snugger ball tie downs detail view below Secure these panels to the frame before installing the main cover Inside View of End panel Fabric Clips ...

Page 13: ...Close up view of snugger ball locations After fabric clips have been installed to the proper positions put a Tek screw through them in order to keep the clip from sliding off of the pipe Detail view below ...

Page 14: ...pe so any sharp edges will not be able to tear the fabric when sliding the pipe into position INSTALLING THE COVER Step One Unpack cover and unfold it completely with the inside surface facing up Tip The ends with black straps in the hems correspond to the front and back of the shelter Step Two Slide the assembled cover conduit pipe into the hem of the canopy Detail view below ...

Page 15: ...e Step Six In the front and rear hems locate the black straps Step Seven If either of your straps were shipped with a D ring attached you must cut the D ring off with scissors as it is not used on this model Step Eight Fasten ratchets to the outside of the legs with a Tek screw in the bottom hole of the ratchet as shown below There should be a few inches between the end of the cover and the ratche...

Page 16: ...r notched at each leg where you will install a strap If your cover was not notched at the factory continue with this step Cut a 2 long slit in the hem just above the cover conduit Repeat this step on the other side of the hem so you can pass a 1 wide strap over the conduit through the slits Feed the both strap ends together through the slot in the ratchet spool and tighten slightly Refer to the ph...

Page 17: ...oes around the cover conduit Step Five Along the opposite side of the shelter fasten ratchets to the outside of the legs where there are slits in the cover Use a Tek screw in the bottom hole of the ratchet as shown below There should be a few inches between the cover conduit and the ratchet Detail views below ...

Reviews: