Pro Ox 5900-BT-AIR Installation & Startup Guide
Page 5
www.cleanwaterstore.com
Rev. 02-26-2020
System Install Steps Overview
1.
Put gravel in first, then Pro-OX media, then Turbidex media. Add 1 cup of liquid bleach
non-scented and allow to soak for at least 1 hour, but up to 24 hours is OK.
2.
Make the plumbing connections from your existing system to the bypass assembly,
installing extra valves, unions, pressure gauges and hose bibs as needed.
3.
Attach the control head to the tank, and to the bypass assembly.
4.
Install Drain Line tubing (& external flow control assembly if using model 1.5 or 2.0 CF)
5.
Plug in the power supply and program the valve.
6.
Follow the instructions to put the system online and to verify the system is leak-free.
Pre-Installation
1.
Review your packing list to make sure you have received all the parts before
installation.
2.
If you are going to be turning off the water to the house and you have an electric water
heater, shut off the power to the water heater before beginning installation.
3.
Pick a suitable location for your filter system on a dry level spot where it won’t be
exposed to freezing temperatures, direct sunlight, wind or rain.
4.
After the system is installed and running, your water may be discolored, or full of
sediment or rust, especially if you have older or corroded piping. This typically clears
up over a day or two.