Operator's Manual: Models CB-3500 & CB-5000
3-1
SECTION 3: FURNACE ASSEMBLY
Understanding Assembly
Assembling your Clean Burn Furnace is a six-step process which includes:
(1) Installing the Blower Components
(2) Installing the Hot Air Discharge Components
(3) Installing the Energy Retention Disc
(4) Installing the Burner
(5) Installing the Connector Block, Oil Line Tubing, and Air Line Tubing
(6) Installing the Mounting and Stabilizer Brackets
Clean Burn recommends that you review all assembly procedures before proceeding, paying careful
attention to safety information statements. Please note that some assembly procedures apply only to
certain furnace models.
Figures 3A and 3B
on the following pages provide a general overview of the
furnace components and their proper assembly and how the unit should look following proper assembly.
Required Tools and Materials
The following tools and materials are required for furnace assembly and should be gathered before start-
ing any procedures:
• Variable-speed drill
• 1/4" hex-nut driver attachment for drill
• 5/16" hex-nut driver attachment for drill
• Set of open-end wrenches (3/8" - 5/8")
• Medium adjustable wrench
• Medium straight-blade screwdriver
Summary of Contents for CB-3500 series
Page 2: ......
Page 18: ...Operator s Manual Models CB 3500 CB 5000 1 10 ...
Page 36: ...Operator s Manual Models CB 3500 CB 5000 3 16 ...
Page 68: ...Operator s Manual Models CB 3500 CB 5000 5 6 ...
Page 74: ...Operator s Manual Models CB 3500 CB 5000 6 6 ...
Page 94: ...Operator s Manual Models CB 3500 CB 5000 9 10 ...
Page 102: ...Operator s Manual Models CB 3500 CB 5000 10 8 ...
Page 107: ...Operator s Manual Models CB 3500 CB 5000 A 5 ...
Page 126: ...Operator s Manual Models CB 3500 CB 5000 A 24 ...
Page 134: ...Operator s Manual Models CB 3500 CB 5000 C 2 ...