background image

© 2022

Step 2 of 2

Order #XXXXX

Locked layer contains

placeholder marks.

Align hole with pin

Rotate pin. Spring

will push pin into hole.

Counter Top Attachment

1

2

Pin

Hole

SEG Graphic Installation

Corner A

Corner D

Corner B

Corner C

It is important to first insert

graphic into each alternate

corner, then to the sides of

the frame. If this is not done,

graphic will not fit into the

frame correctly.

Step 1

Insert corner A. Turn edge of

graphic so silicon welt is

perpendicular to face of

graphic.  Insert narrow side

of welt with fabric to outside

into the channel.  Repeat for

other side of this corner.

Step 2

Repeat Step 1 for opposite

corner C, then insert corner

B, followed by corner D, to

complete the installation of

the corners.

Graphic Removal

To remove the graphic from

the frame, locate the fabric

pull tab.  Gently pull up on

the tab to remove the fabric.

Step 3

Once all corners are inserted,

press one silicon edge into

channel from corners and

work toward the center.

Make sure welt is fully inserted

into channel.  Continue until

all sides are done.  Smooth

out edges of graphic.

Completed Assembly

Top View

Back View

Front View

Steps:

1) Wrap 

SEG Graphic 

around front & sides of counter as shown.

2) Attach Shelf Supports, using 

Velcro

 then place Internal Shelf on top.

3) Attach Counter Top to assembled base. See 

Counter Top Attachment

 detail.

Internal Shelf

Counter Top

Shelf Supports

attach with

Velcro

Counter Assembly (cont’d)

Reviews: