7
4.
OPERATING INSTRUCTIONS
4.1.
FIRST STEPS
In order to achieve an optimum operation of the machine, please follow the below-mentioned steps
carefully.
-
After unpacking and positioning the machine on a level surface, remove the front cover by
unscrewing the 2 fastening screws shown in
Picture 1
. Lift the front cover out of its anchoring
to expose the pressing system.
-
Check that the supply tunnel is mounted properly and that the fixation lever is fixed
(see
Picture 2
).
Picture 1
Picture 2
fastening screw
fastening screw
Summary of Contents for Fantastic F/D Advance
Page 33: ...33 6 CERTIFICATE...
Page 34: ...34...
Page 35: ...35...
Page 36: ...36...
Page 37: ...37...
Page 38: ...38...
Page 39: ...39...
Page 40: ...40...
Page 41: ...41...
Page 42: ...42...
Page 43: ...43...
Page 50: ...50 Peel basket waisted Art No 500 216 073 Ground plate inlet Art No 500 120 052...