AF300
PRO
INSTALLATION INSTRUCTIONS
SAFETY
Exercise caution when working on the vessel, especially in con
fi
ned spaces or
when working near the bottom or “bilge” area of the boat.
Make sure the work area is properly ventilated prior to beginning installation.
These areas may contain residual fuel or fumes that can be harmful when inhaled.
Extreme vigilance should be used in these spaces especially when working alone.
A basic understanding of drilling, sanding and the vessel’s electrical system are needed for
the installation work required.
The equipment must be installed in accordance with these instructions.
Failure to do so could result in poor product performance, personal injury and/or damage to the vessel.
The success and performance of the system depends on a quality installation.
CLEANING OF THE HULL
It is important to clean the hull close to the time of the installation.
Barnacles and mussels, are not killed by this system.
This system kills the micro-organisms at the bottom of the food chain.
Algae and other vegetation are killed and consequently the barnacles & mussels that feed on them
will not attach to the hull.
ITEMS SUPPLIED
Included in this box:
Control Box Unit AF301C
Transducers from 1 to 4 AF301T as ordered
Transducer cables 1 RG6 coaxial cable for each transducer ordered 5m or10m
Two cable glands 12mm
One pack Devcon adhesive
1
Ultrasonic Marine