4-6
Cisco SCE 2000 4xGBE Installation and Configuration Guide
OL-7824-07
Chapter 4 Installation and Maintenance
Installing the SCE 2000 Platform
Figure 4-3
Installing the System on a Flat Surface
Step 1
Remove any debris and dust from the tabletop or workbench, as well as the surrounding area. Also make
sure your path between the SCE 2000 platform and its new location is unobstructed.
Step 2
Place the SCE 2000 platform on the tabletop or workbench.
Step 3
View the bottom panel by lifting the SCE 2000, placing your hands around the SCE 2000 sides and lifting
the SCE 2000 from underneath. To prevent injury, avoid sudden twists or moves.
There are four marked locations, indicating where to affix the rubber feet (see figure above).
Step 4
Attach the rubber feet by removing the adhesive strips and affix the rubber feet onto the marked locations
(on the bottom panel).
Step 5
Replace the SCE 2000 platform firmly on the tabletop or workbench.
Remember to check for proper ventilation. Allow at least 2 inches (5 cm) on each side for proper
ventilation and 5 inches (12.7 cm) at the back for ventilation.and power cord clearance.
What to Do Next
Proceed to section,
How to Attach a Chassis Ground Connection, page 4-11
to continue the installation.
Rack-Mounting a SCE 2000 Platform
You can mount the SCE 2000 platform to a 19” rack. There are two standard types of equipment racks,
and the appropriate brackets for each are provided in the enclosed kit.
•
19” rack with front rack posts — the mounting kit includes two mounting brackets as illustrated in
and
•
19” rack with front and back rack posts — in addition to the mounting brackets illustrated below,
the mounting kit includes two crossrail supports that the unit slides onto.
LINK RX
Cisco SC
E 2000
Series
4xGBE
TX
RX
MM
TX
LINK RX
TX
RX
MM
TX
LINK RX
TX
RX
MM
TX
LINK RX
TX
RX
MM
TX
GBE-1
SUB
LINE
NET
PWR B
STATUS
PWR A
BYPASS
10/100/
1000
LINK/
ACTIVE
10/100/
1000
LINK/
ACTIVE
GBE-2
SUB L
INE/CAS
CADE
NET
AUX
CONSOL
E
MNG 2
MNG 1
1
2
92782