Figure 152: Moving the deep-front panel away
Step 4
Remove the ground strap cable from the shelf (see the following figure):
Figure 153: Removing the ground strap cable
a) Loosen the ground nut on the shelf.
b) Remove the lug and tighten the nut on the shelf to a torque value of 11.5 in-lb (1.3 N-m).
Stop. You have completed this procedure.
Power Modules
The ONS 15454 M2 system contains the following pluggable power modules:
• AC power module
• DC power module
Cisco ONS 15454 Hardware Installation Guide
228
Installing the ONS 15454 M2 Shelf
Power Modules
Summary of Contents for ONS 15454
Page 2: ... 2019 Cisco Systems Inc All rights reserved ...
Page 16: ...Cisco ONS 15454 Hardware Installation Guide xvi Contents ...
Page 28: ...Cisco ONS 15454 Hardware Installation Guide xxviii Preface Preface ...
Page 36: ...Cisco ONS 15454 Hardware Installation Guide 6 Overview Cisco ONS 15454 M6 Shelf ...
Page 510: ...Cisco ONS 15454 Hardware Installation Guide 480 Hardware Specifications Dimensions ...