20-70
Cisco ONS 15454 Procedure Guide, R5.0
March 2005
Chapter 20 DLPs A300 to A399
DLP-A386 Install Electrical Cables on the UBIC-V EIAs
DLP-A386 Install Electrical Cables on the UBIC-V EIAs
Note
Cisco recommends that you plan for future slot utilization and fully cable all SCSI connectors you will
use later.
Step 1
Starting at the lowest row where you want to install cables on the UBIC-V, place a cable connector over
the desired connection point on the UBIC-V EIA.
shows the UBIC-V slot designations.
Purpose
This task installs DS-1 and DS-3/EC-1 cables on the Universal Backplane
Interface Connector—Vertical (UBIC-V) EIAs.
Tools/Equipment
3/16-inch flat-head screwdriver
DS-1 and DS-3/EC-1 cables, as needed:
•
DS-1 cable, 150 feet: 15454-CADS1-SD
•
DS-1 cable, 250 feet: 15454-CADS1-ID
•
DS-1 cable, 655 feet: 15454-CADS1-LD
•
DS-3/EC-1 cable, 75 feet: 15454-CADS3-SD
•
DS-3/EC-1 cable, 225 feet: 15454-CADS3-ID
•
DS-3/EC-1 cable, 450 feet: 15454-CADS3-LD
Prerequisite Procedures
DLP-A190 Install a UBIC-V EIA, page 18-61
Required/As Needed
As needed
Onsite/Remote
Onsite
Security Level
None
Summary of Contents for ONS 15454 Series
Page 28: ...Tables xxviii Cisco ONS 15454 Procedure Guide R5 0 December 2004 ...
Page 44: ...Tasks xliv Cisco ONS 15454 Procedure Guide R5 0 December 2004 ...
Page 53: ...liii Cisco ONS 15454 Procedure Guide R5 0 December 2004 About this Guide Document Conventions ...
Page 55: ...lv Cisco ONS 15454 Procedure Guide R5 0 December 2004 About this Guide Document Conventions ...
Page 850: ...Index IN 22 Cisco ONS 15454 Procedure Guide R5 0 December 2004 description 4 11 remove 18 23 ...