background image

Figure 55: Removing the ONS 15454 M6 Standard Door

Step 8

Return to your originating procedure (NTP).

NTP-G327 Install the Deep-Front Panel of the ONS 15454 M6
Shelf

This procedure installs the deep-front panel of the ONS 15454 M6 shelf.

Purpose

2 Phillips Dynamometric screwdriver

Socket (6/32 standard) and socket wrench to tighten or loosen the ground nut

Tools/Equipment

Installing the ONS 15454 M6 Shelf

62

Installing the ONS 15454 M6 Shelf

NTP-G327 Install the Deep-Front Panel of the ONS 15454 M6 Shelf

Summary of Contents for ONS 15454 M6

Page 1: ...pen and Remove the Standard Door of the ONS 15454 M6 Shelf on page 57 NTP G327 Install the Deep Front Panel of the ONS 15454 M6 Shelf on page 62 NTP G329 Remove the Deep Front Panel of the ONS 15454 M6 Shelf on page 69 External Connection Units on page 72 NTP G253 Install the ECU or ECU S Module on page 79 NTP L68 Upgrading to ONS 15454 M6 ECU60 S Module on page 82 Power Modules on page 82 NTP G52...

Page 2: ...84 2 mm equipment rack Make sure that the correct type of 19 inch ANSI rack is used for mounting the ONS 15454 M6 shelf as shown in Figure 1 If the shelf is mounted in the front position then it projects 1 7 inches 43 18 mm from the front of the rack If the shelf is mounted in the middle position then it projects 5 1 inches 129 54 mm from the front of the rack The shelf mounts in both Electronic I...

Page 3: ...rovided with the ONS 15454 M6 shipping kit or remove the coating from the threads to ensure electrical continuity Caution The reversible mounting bracket is used to mount the shelf on a 19 inch or 23 inch 482 6 mm or 584 2 mm rack Mounting a Single Shelf Mounting the ONS 15454 M6 shelf on a rack requires a minimum of 10 4 inches 265 mm of vertical rack space To ensure that the mounting is secure u...

Page 4: ...ause the air vents are on either sides of the ONS 15454 M6 shelves ETSI Rack Installation The ONS 15454 M6 shelf is mounted on a 600 x 600 mm 23 6 x 23 6 inch or 600 x 300 mm 23 6 x 11 8 inch ETSI standard equipment rack In an ETSI rack the shelf can be mounted only in the front position The shelf projects 1 7 inch 43 18 mm from the front of the rack and is a total of 431 8 mm 17 inch wide with no...

Page 5: ...uires 264 16 mm 10 4 inches minimum of vertical rack space To ensure the mounting is secure use two to three M6 mounting screws for each side of the shelf A shelf should be mounted at the bottom of the rack if it is the only unit in the rack In an ETSI rack the brackets are mounted only in the front position If the ONS 15454 M6 shelf is fully loaded then two people should install it However it is ...

Page 6: ...ons to control the air flow Front to Front Only ETSI rack Front to Back For ANSI and ETSI racks Front to Top Only ETSI rack In an ANSI rack the air deflectors are mounted only on the 23 inch rack configuration Air Plenum Air plenum orients the air flow in the front to back direction inside the equipment to be compliant with GR 63 issue 4 requirement The air plenum kit has two horizontal and two ve...

Page 7: ...t The following two figures shows the dimensions of the air plenum relative to the cabinet or rack Figure 4 Dimension of Cisco ONS 15454 M6 chassis relative to the air plenum Installing the ONS 15454 M6 Shelf 7 Installing the ONS 15454 M6 Shelf Air Plenum ...

Page 8: ...ont to back air flow Rack Cabinet Supported ANSI 19 inch rack Supported ANSI 19 inch cabinet Supported ANSI 23 inch rack Supported ANSI 23 inch cabinet Supported ETSI cabinet A minimum opening of 20 600 inches is required to install the vertical air plenum behind the front rails The ANSI 19 inch two post rack that is compatible with air plenum installation is available from Telect with part number...

Page 9: ...s screws ETSI M6 0 x 20 pan head Phillips screws Wing head screws 8 Adapter plates One air plenum kit horizontal and vertical air plenums Tools Equipment As needed Required As Needed Onsite Onsite Remote None Security Level Before performing any of the following procedures ensure that power is removed from the DC circuit Statement 1074 Warning Before working on a chassis or working near power supp...

Page 10: ... the screw points that come in contact so that they are free of paint and other nonconductive coating Apply an appropriate antioxidant compound to the surfaces Warning Procedure Depending on the rack or cabinet complete the necessary task DLP G766 Install Air Plenum for ONS 15454 M6 Shelf in ANSI 19 inch Cabinet on page 10 DLP G767 Install Air Plenum in ONS 15454 M6 Shelf for ANSI 23 inch Configur...

Page 11: ...helf slot in the ANSI 19 inch cabinet Step 2 Insert the wing head screws provided with the kit and tighten to a torque value of 11 5 in lb 1 3 N m as shown in the following figure Figure 7 Installing the bottom horizontal air plenum in the ANSI 19 inch cabinet Step 3 Install the vertical air plenum to the left of the horizontal air plenum a Insert the vertical plenum in the free space between the ...

Page 12: ... plenum Follow step 3a to step 3c Figure 9 Installing the right vertical air plenum Step 5 Install the horizontal air plenum above the vertical plenums Follow step 3a to step 3c Installing the ONS 15454 M6 Shelf 12 Installing the ONS 15454 M6 Shelf DLP G766 Install Air Plenum for ONS 15454 M6 Shelf in ANSI 19 inch Cabinet ...

Page 13: ...orizontal air plenums where the chassis will be installed The length must be not less than 10 5 inches 267 mm If the length is less adjust the position of the top horizontal plenum Step 8 Install the ONS 15454 M6 empty chassis between the two horizontal plenums Figure 11 Installing the ONS 15454 M6 chassis between the horizontal air plenum Step 9 Return to your originating procedure NTP Installing...

Page 14: ...de the cabinet and then installed inside the cabinet See DLP G768 Install Pre assembled Air Plenums in ANSI 23 inch Configuration on page 17 Note Procedure Step 1 Install the ANSI 23 inch adapter plates on the horizontal air plenum Step 2 Align the screws to fix the adapter plates to the shelf Insert the screws and tighten them to a torque value of 11 5 in lb 1 3 N m Figure 12 Installing the adapt...

Page 15: ...tall the wing head screws from the internal side of the horizontal plenum as shown in the following figure c Tighten the screws to a torque value of 11 5 in lb 1 3 N m Figure 14 Installing the left vertical air plenum Step 6 Install the vertical plenum to the right of the horizontal air plenum Follow step 5a to step 5c Installing the ONS 15454 M6 Shelf 15 Installing the ONS 15454 M6 Shelf DLP G767...

Page 16: ...he chassis in front position See DLP G562 Mounting the Brackets on the ONS 15454 M6 Shelf for ETSI Rack Configuration on page 34 Step 10 Check the length between the top and bottom horizontal air plenums where the chassis will be installed The length must be not less than 10 5 inches 267 mm If the length is less adjust the position of the top horizontal plenum Step 11 Install the ONS 15454 M6 empt...

Page 17: ...ir plenum Tools Equipment As needed Required As Needed Onsite Onsite Remote None Security Level Procedure Step 1 Install the ANSI 23 inch adapter plates on the horizontal air plenums Step 2 Align the screws to fix the adapter plates to the shelf Insert the screws and tighten them to a torque value of 11 5 in lb 1 3 N m Step 3 Place a horizontal air plenum as the base Step 4 Install the vertical ai...

Page 18: ...tep 4 Figure 18 Pre assembling the air plenums Step 8 Install the ANSI 23 inch adapter plates on the horizontal air plenums Step 9 Install the wing head screws provided with the kit and tighten to a torque value of 11 5 in lb 1 3 N m Installing the ONS 15454 M6 Shelf 18 Installing the ONS 15454 M6 Shelf DLP G768 Install Pre assembled Air Plenums in ANSI 23 inch Configuration ...

Page 19: ...m If the length is less adjust the position of the top horizontal plenum Step 12 Install the empty ONS 15454 M6 chassis between the horizontal plenums Step 13 Return to your originating procedure NTP DLP G769 Install Air Plenum for ONS 15454 M6 Shelf in ETSI Configuration This task installs the air plenum for the ONS 15454 M6 shelf in the ETSI configuration Purpose Installing the ONS 15454 M6 Shel...

Page 20: ...the horizontal air plenums Step 2 Align the screws to fix the adapter plates to the shelf Insert the screws and tighten them to a torque value of 11 5 in lb 1 3 N m Figure 20 Installing the adapter plates on the horizontal air plenum Step 3 Place the horizontal plenum below the chassis slot in the ETSI cabinet Step 4 Install the wing head screws provided with the kit and tighten to a torque value ...

Page 21: ...ing head screws from the internal side of the horizontal plenum as shown in the following figure c Tighten the screws to a torque value of 11 5 in lb 1 3 N m Figure 22 Installing the left vertical air plenum Step 6 Install the vertical air plenum to the right of the horizontal air plenum Follow step 5a to step 5c Installing the ONS 15454 M6 Shelf 21 Installing the ONS 15454 M6 Shelf DLP G769 Insta...

Page 22: ...dard brackets on both sides of the chassis in front position See DLP G562 Mounting the Brackets on the ONS 15454 M6 Shelf for ETSI Rack Configuration on page 34 Step 10 Check the length between the top and bottom horizontal air plenums where the chassis will be installed The length must be not less than 10 5 inches 267 mm If the length is less adjust the position of the top horizontal plenum Insta...

Page 23: ...Line Card Slot 7 Flow CFM Deflector Configuration Case 13500 RPM 40 C and 55 C 9600 RPM 27 C 13500 RPM 40 C and 55 C 9600 RPM 27 C 21 14 9 22 4 16 No deflectors Side to Side 10 6 9 11 2 8 2 Inlet and Outlet ETSI Front to Rear 18 4 12 7 16 8 12 2 Only Inlet ETSI Front to Side 14 7 10 6 18 7 13 4 Inlet and Outlet ANSI Front to Rear 19 7 14 1 20 7 14 8 Only Inlet ANSI Front to Side BulkChassisFlow CF...

Page 24: ...ing screws Tools Equipment NTP G305 Unpack and Inspect the ONS 15454 ONS 15454 M2 and ONS 15454 M6 Shelves Prerequisite Procedures Required Required As Needed Onsite Onsite Remote None Security Level Stability hazard The rack stabilizing mechanism must be in place or the rack must be bolted to the floor before you slide the unit out for servicing Failure to stabilize the rack can cause the rack to...

Page 25: ... the rack if it is the only unit in the rack When mounting this unit in a partially filled rack load the rack from the bottom to the top with the heaviest component at the bottom of the rack If the rack is provided with stabilizing devices install the stabilizers before mounting or servicing the unit in the rack Statement 1006 To prevent airflow restriction allow clearance around the ventilation o...

Page 26: ...essary task as applicable DLP G674 Verify the ONS 15454 M6 Shelf for AC Power Module Installation on page 27 DLP G675 Verify the ONS 15454 M6 Shelf for DC Power Module Installation on page 28 Step 2 Complete the necessary task as applicable DLP G560 Mounting the Reversible Brackets on the ONS 15454 M6 Shelf for ANSI Rack Configuration on page 29 Installing the ONS 15454 M6 Shelf 26 Installing the ...

Page 27: ...ack Two People on page 47 DLP G568 Mount Multiple ONS 15454 M6 Shelves on a Rack on page 48 Step 4 Connect the chassis to the office ground For detailed instructions on how to ground the chassis see the Electrostatic Discharge and Grounding Guide for Cisco CPT and Cisco ONS Platforms Step 5 Continue with NTP G259 Open and Remove the Standard Door of the ONS 15454 M6 Shelf on page 57 Stop You have ...

Page 28: ...tallation Purpose None Tools Equipment NTP G305 Unpack and Inspect the ONS 15454 ONS 15454 M2 and ONS 15454 M6 Shelves Prerequisite Procedures Required Required As Needed Onsite Onsite Remote None Security Level Procedure Step 1 Verify the position of the mechanical locking system on the rear side of the chassis To use the DC power module the screw must be close to the DC silk screen text see the ...

Page 29: ...or ANSI rack configuration Purpose 2 Phillips Dynamometric screwdriver Medium slot head screwdriver Small slot head screwdriver Tools Equipment NTP G305 Unpack and Inspect the ONS 15454 ONS 15454 M2 and ONS 15454 M6 Shelves Prerequisite Procedures As needed Required As Needed Onsite Onsite Remote None Security Level Use only the fastening hardware provided with the ONS 15454 M6 to prevent loosenin...

Page 30: ...Configuration on page 31 The narrow side of the mounting bracket should be towards the front of the shelf For a 23 inch 584 2 mm configuration place the narrow side of the mounting bracket flush against the shelf see Figure 30 Mounting the Brackets on the ONS 15454 M6 shelf for a 23 inch 584 2 mm ANSI Configuration on page 31 The widest side of the mounting bracket should be towards the front of t...

Page 31: ...s mounting the brackets for a 23 inch 584 2 mm configuration Figure 30 Mounting the Brackets on the ONS 15454 M6 shelf for a 23 inch 584 2 mm ANSI Configuration Installing the ONS 15454 M6 Shelf 31 Installing the ONS 15454 M6 Shelf DLP G560 Mounting the Reversible Brackets on the ONS 15454 M6 Shelf for ANSI Rack Configuration ...

Page 32: ...ector flush against the right side of the chassis see Diagram 1 of Figure 31 Mounting the Air Deflectors Front to Back on the ONS 15454 M6 Shelf for the ANSI rack Configuration on page 33 Step 2 Align the screw holes on the right front air deflector with the screw holes on the right side of the chassis Step 3 Insert the screws and tighten them to a torque value of 11 5 in lb 1 3 N m Step 4 Place t...

Page 33: ...Place the 23 inch mounting bracket flush in the front position see Diagram 1 of Figure 32 Mounting the Brackets with Air Deflectors Front to Back on the ONS 15454 M6 Shelf for ANSI Rack Configuration on page 34 or in the middle position see Diagram 3 of Figure 32 Mounting the Brackets with Air Deflectors Front to Back on the ONS 15454 M6 Shelf for ANSI Rack Configuration on page 34 against the lef...

Page 34: ...iguration In an ETSI rack the mounting brackets are installed only in the front position Note Purpose 2 Phillips Dynamometric screwdriver Medium slot head screwdriver Small slot head screwdriver Tools Equipment NTP G305 Unpack and Inspect the ONS 15454 ONS 15454 M2 and ONS 15454 M6 Shelves Prerequisite Procedures As needed Required As Needed Onsite Onsite Remote None Security Level Installing the ...

Page 35: ...ion Procedure Step 1 Place the mounting bracket flush against the shelf as shown in the following figure Step 2 Align the mounting bracket screw holes against the shelf screw holes Step 3 Insert the screws and tighten them to a torque value of 11 5 in lb 1 3 N m Step 4 Repeat steps 1 through 3 for the mounting bracket on the opposite side Figure 33 Mounting the Brackets on the ONS 15454 M6 Shelf f...

Page 36: ... and electromechanical corrosion of the hardware and joined material Caution Procedure Step 1 Place the right front air deflector flush against the right side of the chassis see the following figure Step 2 Align the screw holes on the right front air deflector with the screw holes on the right side of the chassis Figure 34 Mounting the Air Deflectors Front to Front on the ONS 15454 M6 Shelf for ET...

Page 37: ...es Prerequisite Procedures As needed Required As Needed Onsite Onsite Remote None Security Level Use only the fastening hardware provided with the ONS 15454 M6 to prevent loosening deterioration and electromechanical corrosion of the hardware and joined material Caution Procedure Step 1 Place the right front air deflector flush against the right side of the chassis see Diagram 1 of Figure 35 Mount...

Page 38: ...gn the screw holes on the mounting bracket with the screw holes on the left side of the chassis Step 9 Insert the screws and tighten them to a torque value of 11 5 in lb 1 3 N m Step 10 Place the mounting bracket flush in the middle position see Diagram 1 of Figure 36 Mounting the Bracket with Air Deflectors Front to Back on the ONS 15454 M6 Shelf for ETSI Rack Configuration on page 39 or the fron...

Page 39: ...t to top on the ONS 15454 M6 shelf for ETSI rack configuration Purpose 2 Phillips Dynamometric screwdriver Medium slot head screwdriver Small slot head screwdriver Tools Equipment NTP G305 Unpack and Inspect the ONS 15454 ONS 15454 M2 and ONS 15454 M6 Shelves Prerequisite Procedures As needed Required As Needed Onsite Onsite Remote None Security Level Installing the ONS 15454 M6 Shelf 39 Installin...

Page 40: ... air deflector flush against the right side of the chassis see Diagram 1 of Figure 37 Mounting the Bracket with Air Deflectors Front to Top on the ONS 15454 M6 Shelf for ETSI Rack Configuration Front Position on page 41 Step 4 Align the screw holes on the right front air deflector with the screw holes on right side of the chassis Step 5 Insert the screws and tighten them to a torque value of 11 5 ...

Page 41: ... Align the screw holes on the right front air deflector with the screw holes on the right side of the chassis Step 14 Insert M4 pan head screws and tighten them to a torque value of 11 5 in lb 1 3 N m Step 15 Place the mounting bracket flush in the middle position on the right front air deflector see Diagram 2 of Figure 38 Mounting the Bracket with Air Deflectors Front to Top on the ONS 15454 M6 S...

Page 42: ... Rack Configuration Middle Position on page 42 Step 22 Align the screw holes on the mounting bracket with the screw holes on the left top air deflector Step 23 Insert M4 flat head screws and tighten them to a torque value of 11 5 in lb 1 3 N m Figure 38 Mounting the Bracket with Air Deflectors Front to Top on the ONS 15454 M6 Shelf for ETSI Rack Configuration Middle Position Step 24 Return to your...

Page 43: ...te Remote None Security Level Use only the fastening hardware provided with the ONS 15454 M6 to prevent loosening deterioration and electromechanical corrosion of the hardware and joined material Caution It is recommended to maintain a space of one RU between two chassis in a rack for cable management Note Hot and cold aisle airflow management must be planned for the installation Note Procedure St...

Page 44: ...s on the mounting bracket with the screw holes on the right front air deflector Step 6 Insert M4 flat head screws and tighten them to a torque value of 11 5 in lb 1 3 N m Step 7 Place the mounting bracket flush in the middle or front position on the left side of the chassis see Diagram 2 of Figure 40 Mounting the Bracket with Air Deflectors Front to Side on the ONS 15454 M6 Shelf for ETSI Rack Con...

Page 45: ...guration Front Position Step 10 Return to your originating procedure NTP DLP G566 Mount the ONS 15454 M6 Shelf on a Rack One Person This task allows one person to mount the shelf on a rack When the chassis is installed in the middle position in an ETSI rack the cabinet doors must be kept open if present Note Purpose Installing the ONS 15454 M6 Shelf 45 Installing the ONS 15454 M6 Shelf DLP G566 Mo...

Page 46: ...rating must not exceed 40A For an AC power supply the fuse rating must not exceed 10A 15A or 20A For North America the branch circuit protection must be rated 20A The overcurrent short circuit protection must be in accordance with local and national electrical codes Step 2 Ensure that the shelf is mounted on the appropriate rack equipment 23 inches 584 2 mm or 19 inches 482 6 mm for ANSI racks The...

Page 47: ...assembly Tighten the screw to a torque value of 22 in lb 2 5 N m Step 6 When the shelf is secured to the rack install the remaining two mounting screws on either sides Use at least one set of the horizontal screw slots on the shelf to prevent slippage Note Step 7 Return to your originating procedure NTP DLP G567 Mount the ONS 15454 M6 Shelf on a Rack Two People This task allows two people to mount...

Page 48: ...I racks 600 x 600 mm 23 6 x 23 6 inch or 600 x 300 mm 23 6 x 11 8 inch for ETSI racks Step 3 Lift the shelf to the desired position in the rack If the rack is empty place the shelf at the bottom of the rack The placement of the shelf is dependent on where you want to install the new equipment in the rack To ensure proper cooling of the ONS 15454 M6 shelf make sure that the space in front of the ai...

Page 49: ... Procedure Step 1 Verify that the proper fuse and alarm panel has been installed in the top mounting space If a fuse and alarm panel is not present you must install one according to manufacturer s instructions For a DC power supply the fuse rating must not exceed 40A For AC power supply the fuse rating must not exceed 20A Step 2 Mount the first shelf in the bottom of the rack using the DLP G566 Mo...

Page 50: ...ting tray fan tray assembly and LCD screen There are two types of front doors that act as protective panels standard door and deep front panel The deep front panel provides additional space in front of the shelf to accommodate cables that do not fit inside the standard door It also provides more space for fiber bend radius and to manage the line card connections The Installing the ONS 15454 M6 She...

Page 51: ... the tape that is present on top of the door Note You must remove the door before proceeding with the shelf installation The ONS 15454 M6 door can be opened by loosening the front screws and pushing the latch in the opposite direction You can remove the front door to provide unrestricted access to the front of the shelf An erasable label is pasted on the inside of the front door You can use the la...

Page 52: ... 15454 M6 The following figure shows the label that is placed on top of ONS 15454 M6 Figure 46 ONS 15454 M6 Label Figure 47 ONS 15454 M6 Front Door Label Installing the ONS 15454 M6 Shelf 52 Installing the ONS 15454 M6 Shelf Front Door ...

Page 53: ...tall the Power Modules in the ONS 15454 M6 Shelf on page 85 NTP G255 Install the LCD Module in the ONS 15454 M6 Shelf on page 96 NTP G256 Install Power and Ground to the ONS 15454 M6 Shelf on page 100 NTP G257 Install the Fan Tray Assembly in the ONS 15454 M6 Shelf on page 118 NTP G290 Install the Cable and Fiber Modules on page 121 NTP G312 Attach Wires to Alarm Timing LAN and Craft Pin Connectio...

Page 54: ...ep 6 Place the retention feature on the pin present on the chassis See Diagram 2 of Figure 49 Mounting the Mechanical Stop on page 55 Step 7 Raise the door to slide the pin See Diagram 3 of Figure 49 Mounting the Mechanical Stop on page 55 Step 8 Slide the mechanical stop to lock the door position and tighten the screws See Diagram 4 of Figure 49 Mounting the Mechanical Stop on page 55 Reinstall t...

Page 55: ...Figure 49 Mounting the Mechanical Stop Installing the ONS 15454 M6 Shelf 55 Installing the ONS 15454 M6 Shelf NTP G258 Install the Standard Door of the ONS 15454 M6 Shelf ...

Page 56: ...ge 56 on the door and the chassis and tighten the nuts to a torque value of 11 5 in lb 1 3 N m to lock the cable Step 10 Tighten the door screws to a torque value of 6 5 in lb 0 75 N m to close the standard door as shown in the following figure Installing the ONS 15454 M6 Shelf 56 Installing the ONS 15454 M6 Shelf NTP G258 Install the Standard Door of the ONS 15454 M6 Shelf ...

Page 57: ...helf on page 24 Connect the chassis to the office ground For detailed instructions on how to ground the chassis see the Electrostatic Discharge and Grounding Guide for Cisco CPT and Cisco ONS Platforms Prerequisite Procedures Required Required As Needed Onsite Onsite Remote None Security Level Procedure Step 1 Complete the DLP G576 Open the Standard Door of the ONS 15454 M6 Shelf on page 58 Instal...

Page 58: ...te Remote None Security Level The ONS 15454 M6 shelf has an ESD plug input and is shipped with an ESD wrist strap The ESD plug input is located on the outside of the shelf on the left side It is labeled ESD on the top and bottom Always wear an ESD wrist strap and connect the strap to the ESD plug when working on the ONS 15454 M6 For detailed instructions on how to wear the ESD wristband see the El...

Page 59: ...door open The retention feature maintains the door in the horizontal position for line card insertion see the following figure Installing the ONS 15454 M6 Shelf 59 Installing the ONS 15454 M6 Shelf DLP G576 Open the Standard Door of the ONS 15454 M6 Shelf ...

Page 60: ...DLP G576 Open the Standard Door of the ONS 15454 M6 Shelf on page 58 Prerequisite Procedures As needed Required As Needed Onsite Onsite Remote None Security Level Procedure Step 1 Unscrew the nut holding the ground cable to the shelf Remove the nut Step 2 Remove the ground cable from the shelf see the following figure Installing the ONS 15454 M6 Shelf 60 Installing the ONS 15454 M6 Shelf DLP G577 ...

Page 61: ... Remove the retention feature from the pin present on the chassis Step 6 Pull the hinge pins holding the door to the chassis in the opposite direction see the following figure Step 7 Remove the door from its hinges see the following figure Installing the ONS 15454 M6 Shelf 61 Installing the ONS 15454 M6 Shelf DLP G577 Remove the Standard Door of the ONS 15454 M6 Shelf ...

Page 62: ...54 M6 Shelf This procedure installs the deep front panel of the ONS 15454 M6 shelf Purpose 2 Phillips Dynamometric screwdriver Socket 6 32 standard and socket wrench to tighten or loosen the ground nut Tools Equipment Installing the ONS 15454 M6 Shelf 62 Installing the ONS 15454 M6 Shelf NTP G327 Install the Deep Front Panel of the ONS 15454 M6 Shelf ...

Page 63: ...o Alarm Timing LAN and Craft Pin Connections in Cisco ONS 15454 M6 on page 127 Prerequisite Procedures As needed Required As Needed Onsite Onsite Remote None Security Level Use the deep front panel when ONS SC 10G C pluggables are installed on ONS 15454 M6 shelf Note When the deep front panel is installed the total chassis depth is 12 9 inches The deep front panel extends from the rack by 1 8 inch...

Page 64: ...t panel screws and slide them outwards using the plastic tabs Step 3 Place the deep front panel close to the shelf so that the shelf notches and the deep front panel retention features are in line as shown in the following figure Installing the ONS 15454 M6 Shelf 64 Installing the ONS 15454 M6 Shelf NTP G327 Install the Deep Front Panel of the ONS 15454 M6 Shelf ...

Page 65: ...tention features of the deep front panel with the right and left notches present on the top of the shelf see the following figure b Align the deep front panel pins present at the bottom of the panel with the shelf hinges see the following figure Installing the ONS 15454 M6 Shelf 65 Installing the ONS 15454 M6 Shelf NTP G327 Install the Deep Front Panel of the ONS 15454 M6 Shelf ...

Page 66: ... Panel Pins and Shelf hinges The following figure shows the deep front panel aligned with the shelf Installing the ONS 15454 M6 Shelf 66 Installing the ONS 15454 M6 Shelf NTP G327 Install the Deep Front Panel of the ONS 15454 M6 Shelf ...

Page 67: ...c tabs to engage the retention features and the pins with the shelf notches and hinges see the following figure Verify the engagement by gently applying outward pressure to the panel Installing the ONS 15454 M6 Shelf 67 Installing the ONS 15454 M6 Shelf NTP G327 Install the Deep Front Panel of the ONS 15454 M6 Shelf ...

Page 68: ...75 N m Step 7 Connect the other end of the ground strap cable to the ground point present on the deep front panel exterior see the following figure Figure 61 Connecting ground strap cable to the ground point Installing the ONS 15454 M6 Shelf 68 Installing the ONS 15454 M6 Shelf NTP G327 Install the Deep Front Panel of the ONS 15454 M6 Shelf ...

Page 69: ...ide for Cisco CPT and Cisco ONS Platforms Prerequisite Procedures Required Required As Needed Onsite Onsite Remote None Security Level The deep front panel does not have a hinge and cannot be rotated like a standard door Rotating the deep front panel can damage the deep front panel shelf hinges other devices and cables placed below the ONS 15454 M6 shelf Caution When the deep front panel is instal...

Page 70: ...stic tabs to open the deep front panel as shown in the following figure Figure 63 Moving the deep front panel to disengage Step 3 Move the deep front panel away from the shelf see the following figure Installing the ONS 15454 M6 Shelf 70 Installing the ONS 15454 M6 Shelf NTP G329 Remove the Deep Front Panel of the ONS 15454 M6 Shelf ...

Page 71: ...ng figure Figure 65 Removing the ground strap cable a Loosen the ground nut on the shelf b Remove the lug and tighten the nut on the shelf to a torque value of 11 5 in lb 1 3 N m Installing the ONS 15454 M6 Shelf 71 Installing the ONS 15454 M6 Shelf NTP G329 Remove the Deep Front Panel of the ONS 15454 M6 Shelf ...

Page 72: ...ternal connections of ONS 15454 M6 present on the ECU are 12 remote inventory standard USB connections 2 BITS OUT connections 2 subminiature version B SMB connectors for ETSI and 4 wire wrap pins for ANSI 2 BITS IN connections 2 SMB connectors for ETSI and 4 wire wrap pins for ANSI 6 multishelf connections 1 element management system EMS connection 1 craft terminal connection 2 VoIP or 2 user data...

Page 73: ... signals on the left side connector 1 SCSI with 26 poles for digital I O signals on the right side connector The following figure shows the ECU2 connectors Figure 68 Connectors on ECU2 Faceplate The ECU2 should not be used when the shelf is powered at 60 VDC nominal input voltage Note ECU 60V The ECU 60V is used when the shelf is powered at 60 VDC nominal input voltage The external connections of ...

Page 74: ... ECU S connectors Figure 70 Connectors on the ONS 15454 M6 ECU S Faceplate 1 SCSI with 26 poles for TNC relay contact including ACO signal and digital I O signals 1 USB 2 0 ports Ports A1 A2 A3 A4 and USB 3 0 port Port A5 2 VOIP UDC port RJ 45 port 3 EMS port RJ 45 port 4 Three MSM ports 5 BITS1 input and output ports 6 BITS2 input and output ports 7 Three MSM ports 8 Craft terminal port 9 VOIP UD...

Page 75: ... OUT connections 2 subminiature version B SMB connectors for ETSI and 4 wire wrap pins for ANSI 10 MHz IN and OUT and PPS IN and OUT hardware ready 2 BITS IN connections 2 SMB connectors for ETSI and 4 wire wrap pins for ANSI 6 multishelf connections 1 element management system EMS connection 1 craft terminal connection 1 time of day ToD connection hardware ready 2 VoIP or 2 user data channel UDC ...

Page 76: ...th releases prior to 10 5 2 The external connections present on the NCS 2006 ECU60 S are 2 USB 3 0 connections The USB 3 0 port on the left of the faceplate is detected as A5 The USB 3 0 port on the left of the faceplate is detected as B5 8 USB 2 0 connections 4 USB 2 0 on the left of the faceplate are detected as A1 A2 A3 A4 4 USB 2 0 ports on the right of the faceplate are detected as B1 B2 B3 B...

Page 77: ...ed shelves cannot be extended through the node controller Note ECU60 S does not support alarm connections Note See Table 5 SCSI Alarm Cable 15454 M ALMCBL and SCSI Alarm Patch Cable 15454 M AEXPCBL Connector Details on page 130 and Table 6 SCSI Alarm Wire Wrap Cable 15454 M ALMCBL2 Connector Details on page 131 for pin details of the alarm connectors Passive Unit Inventory Interfaces The passive u...

Page 78: ...s used to connect the ONS 15454 M6 shelf to other ONS 15454 or ONS 15454 M6 shelves that are a part of the multishelf configuration There are six MSM ports on the ECU modules three ports on the left side and three ports on the right side The MSM ports on the left side correspond to the TNC TNCE TSC TSCE card in Slot 1 and those on the right side correspond to the TNC TNCE TSC TSCE card in Slot 8 T...

Page 79: ...elcordia GR 1089 NEBS standard for electromagnetic compatibility and safety connect the serial high speed WAN interface ports only to intra building or unexposed wiring or cable The intrabuilding cable must be shielded and the shield must be grounded at both ends The intra building port s of the equipment or subassembly must not be metallically connected to interfaces that connect to the OSP or it...

Page 80: ...orking with a powered ONS 15454 M6 For detailed instructions on how to wear the ESD wristband see the Electrostatic Discharge and Grounding Guide for Cisco CPT and Cisco ONS Platforms Caution If the USB device connected to the ECU module is not detected when the ONS 15454 M6 shelf assembly is powered on plug out remove the ECU module and insert it again Note Procedure Step 1 Insert the ECU module ...

Page 81: ...ows the ECU module installed in the ONS 15454 M6 shelf Figure 73 ONS 15454 M6 Shelf with ECU module Installed Stop You have completed this procedure Installing the ONS 15454 M6 Shelf 81 Installing the ONS 15454 M6 Shelf NTP G253 Install the ECU or ECU S Module ...

Page 82: ...in the ONS 15454 M6 shelf as described in the NTP G253 Install the ECU or ECU S Module on page 79 Step 6 Power on the 15454 M6 DC V03 power module as described in the NTP G256 Install Power and Ground to the ONS 15454 M6 Shelf on page 100 Stop You have completed this procedure Power Modules The ONS 15454 M6 system contains pluggable and redundant power modules for AC and DC power The AC and DC pow...

Page 83: ...sioning of a card causes the power consumption to exceed the limit of 1200W The 15454 M6 AC2 has a maximum capacity of1500 W for 230 Vin and 1200 W for 110 Vin Changing the AC Power Module It is possible to change the power modules of the ONS 15454 M6 system from 15454 M6 AC to 15454 M6 AC2 and vice versa without powering down the ONS 15454 M6 system While changing the power modules ensure that on...

Page 84: ...e shelf to exceed 1920 W The PWR CON LMT alarm is raised in the Alarms tab in CTC when the installation or pre provisioning of a card causes the power consumption to exceed the limit of 1920 W The total power consumption of the shelf is calculated by the controller card and displayed in CTC in the Provisioning Power Monitor tab For details about power calculation see Power Calculation Note The ter...

Page 85: ...ure Step 1 Complete the necessary task as applicable DLP G569 Install the AC Power Module in the ONS 15454 M6 Shelf on page 85 DLP G757 Replacing 15454 M6 AC With 15454 M6 AC2 Power module on page 88 DLP G758 Replacing 15454 M6 AC2 With 15454 M6 AC Power module on page 89 DLP G570 Install the DC Power Module in the ONS 15454 M6 Shelf on page 90 DLP G737 Replacing 15454 M6 DC With 15454 M6 DC20 Pow...

Page 86: ...mote None Security Level The node can temporarily work with both 15454 M6 AC and 15454 M6 AC2 power module units installed on the ONS 15454 M6 shelf However during regular operation the shelf must have either the 15454 M6 AC or 15454 M6 AC2 power module but not both Caution Insert the AC power module in Slot A or Slot B or both see the following figure Tip While inserting the AC power module apply...

Page 87: ...s two AC power modul5es can be installed in Slot A and Slot B However only one power module can sustain the functioning of the entire ONS 15454 M6 system In that case insert a power filler module in the empty slot for example see Figure 78 Installing a Power Filler Module on page 93 Note For information on the power module air filter see NTP G114 Inspect and Replace the Air Filter Note Installing ...

Page 88: ... 15454 M6 Shelf on page 57 Prerequisite Procedures Required Required As Needed Onsite Onsite Remote None Security Level Refer to Power Calculation to ascertain the power consumption of the shelf Note Always use the supplied ESD wristband when working with a powered ONS 15454 M6 For detailed instructions on how to wear the ESD wristband see the Electrostatic Discharge and Grounding Guide for Cisco ...

Page 89: ...tep 6 Perform Steps 1 to 5 for the other power module installed in slot A To ensure that the controller card calculates the shelf power consumption correctly reset the controller card For details about performing card reset see the NTP G106 Resetting Cards Using CTC procedure in the Cisco ONS 15454 DWDM Network Configuration Guide Note Return to your originating procedure NTP DLP G758 Replacing 15...

Page 90: ...is in the mixed power mode with both 15454 M6 AC and 15454 M6 AC2 power modules installed Card provisioning and installation must be done only after both the slots have the same type of power modules Note Step 6 Perform steps 1 to 5 for the other power module installed in slot A Step 7 Return to your originating procedure NTP DLP G570 Install the DC Power Module in the ONS 15454 M6 Shelf This proc...

Page 91: ... module but not both Caution Procedure Step 1 Insert the DC power module in Slot A or Slot B or both see the following figure Figure 76 Installing the DC Power Modules Step 2 Plug the DC power module completely into the chassis Step 3 Tighten the screw to a torque value of 4 in lb 0 45 N m to lock the power module in the chassis see the following figure Installing the ONS 15454 M6 Shelf 91 Install...

Page 92: ...tain the functioning of the entire ONS 15454 M6 system In that case insert a power filler module in the empty slot see the following figure Note The following figure shows a DC power module installed in Slot A and a power filler module installed in Slot B Installing the ONS 15454 M6 Shelf 92 Installing the ONS 15454 M6 Shelf DLP G570 Install the DC Power Module in the ONS 15454 M6 Shelf ...

Page 93: ... 15454 M6 DC With 15454 M6 DC20 Power Module This procedure replaces the 15454 M6 DC with 15454 M6 DC20 power module Purpose 2 Phillips Dynamometric screwdriver Tools Equipment NTP G259 Open and Remove the Standard Door of the ONS 15454 M6 Shelf on page 57 Prerequisite Procedures Required Required As Needed Onsite Onsite Remote None Security Level Installing the ONS 15454 M6 Shelf 93 Installing th...

Page 94: ...the ONS 15454 M6 chassis Step 4 Remove the power connections from the standby power module Step 5 Install power on the 15454 M6 DC power module as described in the NTP G256 Install Power and Ground to the ONS 15454 M6 Shelf on page 100 While replacing the power modules do not provision or install any line cards when the ONS 15454 M6 chassis is in the mixed power mode Card provisioning and installa...

Page 95: ...eration the shelf must either have the 15454 M6 DC or 15454 M6 DC20 power module but not both Caution Always use the supplied ESD wristband when working with a powered ONS 15454 M6 For detailed instructions on how to wear the ESD wristband see the Electrostatic Discharge and Grounding Guide for Cisco CPT and Cisco ONS Platforms Caution Procedure Step 1 Disconnect the power source and remove the po...

Page 96: ...ate whether a critical major or minor alarm is present anywhere on the ONS 15454 M6 shelf The shelf controller card controls the conditions that result in triggering the LEDs The LEDs can be overwritten by the shelf controller card TNC TNCE TSC or TSCE in all the three states OFF red green The LCD unit supports the lamp test procedure and the LEDs changes its color or state If the LCD unit is remo...

Page 97: ...Note Procedure Step 1 Insert the LCD module in the central slot between the power slots of the chassis see the following figure Figure 79 Installing the LCD Module Step 2 Push the LCD module into the chassis such that the backplane connector is completely engaged see the above figure Step 3 Tighten the screw to a torque value of 4 in lb 0 45 N m to lock the unit see the following figure Installing...

Page 98: ...co ONS Platforms Note ANSI Power and Ground The ONS 15454 M6 has redundant AC and DC power modules For redundant AC power feeds install both the AC power modules and use the two power cables right and left cables shipped with the ONS 15454 M6 and one ground cable For an AC power supply the fuse rating must not exceed 10A 15A or 20A For North America the branch circuit protection must be rated 20A ...

Page 99: ...on is treated as DC I as defined in Telcordia GR 1089 CORE Issue 3 The ground lug must be a dual hole type UL Listed CSA certified and rated to accept the 6 AWG cable Two ground posts with two M5 nuts are provided on the ONS 15454 M6 to accommodate the dual hole lug Only use the power cables shipped with the ONS 15454 M6 shelf Note ETSI Power and Ground The ONS 15454 M6 for ETSI has 48 VDC or 60 V...

Page 100: ... with the ONS 15454 M6 Tools Equipment NTP G524 Install the Power Modules in the ONS 15454 M6 Shelf on page 85 Connect the chassis to the office ground For detailed instructions on how to ground the chassis see the Electrostatic Discharge and Grounding Guide for Cisco CPT and Cisco ONS Platforms Prerequisite Procedures Required Required As Needed Onsite Onsite Remote None Security Level To ensure ...

Page 101: ...type with upturned lugs These terminations should be the appropriate size for the wires and should clamp both the insulation and conductor Statement 1002 Warning Before performing any of the following procedures ensure that power is removed from the DC circuit Statement 1003 Warning Before working on a chassis or working near power supplies unplug the power cord on AC units Statement 246 Warning T...

Page 102: ... M6 For detailed instructions on how to wear the ESD wristband see the Electrostatic Discharge and Grounding Guide for Cisco CPT and Cisco ONS Platforms Caution Procedure Step 1 Verify that the correct fuse and alarm panel is installed in the top mounting space For a a DC power supply the fuse rating must not exceed 40A For an AC power supply the fuse rating must not exceed 10A 15A or 20A For Nort...

Page 103: ...6 AWG stranded The PIDs of the power cables are listed in Table 2 PIDs for AC Power Cables on page 106 Tools Equipment NTP G252 Install the ONS 15454 M6 Shelf on page 24 NTP G259 Open and Remove the Standard Door of the ONS 15454 M6 Shelf on page 57 Connect the chassis to the office ground For detailed instructions on how to ground the chassis see the Electrostatic Discharge and Grounding Guide fo...

Page 104: ...soldering lug connectors screwless push in connectors quick connect connectors or other friction fit connectors Caution If the system loses power or if both the TNC TNCE TSC or TSCE cards are reset you must reset the ONS 15454 M6 clock After powering down the date defaults to January 1 1970 00 04 15 To reset the clock see the NTP G24 Setting Up Node Identification Information procedure in the Cisc...

Page 105: ...ure 82 Cable Clip to Secure the Power Cable For Slot A power module the power cable exits from the left side For Slot B power module the power cable exits from the right side see the following figure Note Installing the ONS 15454 M6 Shelf 105 Installing the ONS 15454 M6 Shelf DLP G571 Connect Office Power AC to the ONS 15454 M6 Shelf ...

Page 106: ... Power Cables PID Cable 15454 M CBL L JPN AC power cable Japan left exit 15454 M CBL R JPN AC power cable Japan right exit 15454 M CBL L CHI AC power cable China left exit 15454 M CBL R CHI AC power cable China right exit 15454 M CBL L IND AC power cable India left exit 15454 M CBL R IND AC power cable India right exit 15454 M CBL L EU AC power cable EU left exit 15454 M CBL R EU AC power cable EU...

Page 107: ...5454 M ACL6 L AC power cable for data center left exit 15454 M ACL6 R AC power cable for data center right exit DLP G572 Connect Office Power DC to the ONS 15454 M6 Shelf ANSI Only This task connects DC power to the ONS 15454 M6 ANSI Only Purpose 2 Phillips Dynamometric screwdriver Medium slot head screwdriver Small slot head screwdriver Wire wrapper Wire cutters Wire strippers Crimp tool Open end...

Page 108: ...otect against short circuit overcurrent and ground faults Ensure that the protective devices are properly rated and comply with national and local codes Caution The battery return connection is treated as DC I as defined in Telcordia GR 1089 CORE Issue 5 Note If the system loses power or both the TNC TNCE TSC or TSCE cards are reset and the system is not provisioned to get the time from a Network ...

Page 109: ...mp the lugs onto the ends of all the power leads Step 7 Verify that the DC power module is installed in Slot A or Slot B or both of the ONS 15454 M6 shelf Step 8 Remove the terminal block protective covers from the DC power modules see the following figure Figure 84 Connecting Office Power DC Power Modules ANSI Only Step 9 Unscrew the nuts from the terminal block see the following figure Installin...

Page 110: ...nt the terminal block protective covers on the DC power modules see the following figure For Slot A power module the power cable exits from the left side For Slot B power module the power cable exits from the right side Note Use only pressure terminal connectors such as ring and fork types when terminating the battery battery return and frame ground conductors Note Installing the ONS 15454 M6 Shel...

Page 111: ... and frame ground do not use soldering lug screwless push in connectors quick connect or other friction fit connectors Caution Step 13 Return to your originating procedure NTP DLP G573 Connect Office Power DC to the ONS 15454 M6 Shelf ETSI Only This task connects power to the ONS 15454 M6 shelf ETSI Only Purpose 2 Phillips Dynamometric screwdriver Medium slot head screwdriver Small slot head screw...

Page 112: ...RE Issue 5 Note The ONS 15454 M6 relies on the protective devices in the building installation to protect against short circuit overcurrent and ground faults Ensure that the protective devices are properly rated and comply with national and local codes Caution If the system loses power or both TNC TNCE TSC or TSCE cards are reset and the system is not provisioned to get the time from a Network Tim...

Page 113: ...odules see the following figure Figure 87 Connecting Office Power DC Power Modules ETSI Only Step 4 Attach the DC ETSI power cable to the cable connector in the DC power module see the following figure Step 5 Tighten the screws to a torque value of 4 in lb 0 45 N m to secure the cable see the following figure Installing the ONS 15454 M6 Shelf 113 Installing the ONS 15454 M6 Shelf DLP G573 Connect ...

Page 114: ...me ground with an appropriate antioxidant compound Bring all unplated connectors braided strap and bus bars to a bright finish then coat with an antioxidant before you connect them You do not need to prepare tinned solder plated or silver plated connectors and other plated connection surfaces but always keep them clean and free of contaminants Caution When terminating power return and frame ground...

Page 115: ...None Security Level Do not apply power to the shelf until you complete all the installation steps Caution To ensure safety of personnel and equipment do not connect any power cables into the power module until the module is completely installed into the chassis Statement 389 Warning To reduce the risk of electric shock switch on the power only after the power cord is completely installed into the ...

Page 116: ...ite Onsite Remote None Security Level Do not apply power to the shelf until you complete all the installation steps Caution To ensure safety of personnel and equipment do not connect any power cables into the power module until the module is completely installed into the chassis Statement 389 Warning To reduce the risk of electric shock switch on the power only after the power cord is completely i...

Page 117: ...40 5 VDC and 72 0 VDC Then place the red test lead of the voltmeter to the RET2 B side return ground black cable and verify that no voltage is present To view the shelf voltage and temperature see the NTP G230 View Shelf Voltage and Temperature Note If the ONS 15454 M6 shelf is being powered at 60 VDC nominal voltage the door must be kept closed during regular operation Note Step 4 Return to your ...

Page 118: ... FTA2 fan tray assembly in the ONS 15454 M6 system Purpose Small slot head screwdriver Tools Equipment NTP G252 Install the ONS 15454 M6 Shelf on page 24 NTP G259 Open and Remove the Standard Door of the ONS 15454 M6 Shelf on page 57 Connect the chassis to the office ground For detailed instructions on how to ground the chassis see the Electrostatic Discharge and Grounding Guide for Cisco CPT and ...

Page 119: ... Insert the fan tray assembly inside the left slot fan tray slot of the ONS 15454 M6 chassis see the following figure Figure 89 Installing the Fan Tray Assembly Step 2 Push the fan tray assembly such that the backplane connector is engaged completely Step 3 Tighten the screws to a torque value of 4 in lb 0 45 N m to lock the fan tray assembly into the chassis see the following figure Installing th...

Page 120: ...ius is 1 5 inches The fiber guide can be replaced with a cable guide to route the CAT 5 Ethernet cables The maximum number of 2 mm diameter patch cords that can be managed is 144 or alternatively 72 CAT5 cables To manage extra length fiber and fan out a dedicated fiber storage unit and patch panel unit can be installed inside the rack The maximum capacity of the fiber channel for one side of the s...

Page 121: ...k attenuator outside the shelf from any port of a card Note Cable and Fiber Routing Cable and fiber routing accommodates all the high density cards for line card connections in ONS 15454 M6 The exit of the fibers and cables is split into two channels The line card from slot 1 to 4 exits from the lower right side and the line card from 5 to 8 exit from the upper right side See the following figure ...

Page 122: ...ools Equipment None Prerequisite Procedures As needed Required As Needed Onsite Onsite Remote None Security Level Procedure Step 1 Loosen the screws on the fiber module present on the right side of the ONS 15454 M6 assembly See the following figure Step 2 Loosen the screw present on the air filter locking feature of the ONS 15454 M6 shelf Step 3 Remove the air filter locking feature by holding the...

Page 123: ...d As Needed Onsite Onsite Remote None Security Level Procedure Step 1 Insert the air filter locking feature on the cable module See the following figure Step 2 Attach the slot label identity on the cable module with screws Step 3 Mount the cable module on the chassis and tighten the screws to a torque value of 4 in lb 0 45 N m to attach the cable module to the ONS 15454 M6 shelf Installing the ONS...

Page 124: ...sure an extra length of ECU cable is available to allow cable management during extraction of the power module See Diagram 1 of Figure 97 Sequence to Remove the Power Module on page 127 It is also possible to manage the extraction of the power module without adding the extra length of ECU cable by reducing the number of cables in the right exit area see Diagram 1 of Figure 95 Cable Management on p...

Page 125: ...cessories kit Step 3 To route the optical patch cords or copper cables do the following as necessary a Route the optical patch cords from the line cards through the fiber or cable module as shown in the following figure Installing the ONS 15454 M6 Shelf 125 Installing the ONS 15454 M6 Shelf DLP G655 Route and Lock Cables ...

Page 126: ... chassis See Diagram 2 of Figure 97 Sequence to Remove the Power Module on page 127 b Move the ECU cables away from the chassis Ensure that the alarm cable with the plastic bend radius controller is not moved See Diagram 3 of Figure 97 Sequence to Remove the Power Module on page 127 c Remove the power module See Diagram 4 of Figure 97 Sequence to Remove the Power Module on page 127 Installing the ...

Page 127: ...51 mm or 0 64 mm shielded wires for LAN or craft 75 ohm coaxial cable with DIN 1 0 2 3 miniature coaxial connector Alarm 26 pins SCSI cable The PIDs of the SCSI cables are listed in Table 4 PIDs for SCSI Cables on page 128 Tools Equipment NTP G253 Install the ECU or ECU S Module on page 79 Prerequisite Procedures As needed Required As Needed Installing the ONS 15454 M6 Shelf 127 Installing the ONS...

Page 128: ...ted this procedure Table 4 PIDs for SCSI Cables WireDimension Length PID Cable 28 AWG 20 Meter 15454 M ALMCBL SCSI alarm cable 28 AWG 1 Meter 15454 M AEXPCBL SCSI alarm patch cable 24 AWG 20 Meter 15454 M ALMCBL2 SCSI alarm wire wrap cable Some wire wrap tools require a minimum of 24 AWG wires to prevent breakage Ensure that the SCSI alarm wire wrap cable is used for 24 AWG wires When the SCSI ala...

Page 129: ... the operator assigns to a definite wire color and name through the Craft Terminal Note Step 2 Tighten the screws of the SCSI connector to a torque value of 4 in lb 0 45 N m using 2 Philips Dynamometric screwdriver See Diagram 2 of Figure 98 Installing the ECU Alarm Cable Left Exit Option on page 130 or Figure 99 Installing the ECU Alarm Cable Right Exit Option on page 130 Step 3 Bend the cable at...

Page 130: ...nd SCSI Alarm Patch Cable 15454 M AEXPCBL Connector Details Input Output Alarms Left Connector Input Alarms Right Alarm Connector Color Code PinNumber Minor Audible Alarm Input Pair 1 Black Brown 1 Major Audible Alarm Input Pair 2 Black Red 2 Installing the ONS 15454 M6 Shelf 130 Installing the ONS 15454 M6 Shelf DLP G295 Install Alarm Wires in ONS 15454 M6 ...

Page 131: ...m Input Pair 2 Red Black 15 Critical Audible Alarm Input Pair 3 Orange Black 16 Remote Audible Alarm Input Pair 4 Yellow Black 17 Minor Visual Alarm Input Pair 5 Green Black 18 Major Visual Alarm Input Pair 6 Blue Black 19 Critical Visual Alarm Input Pair 7 Blue White 20 Remote Visual Alarm Input Pair 8 Orange White 21 Input Pair 9 Green White 22 Alarm Cutoff ACO Input Pair 10 Brown White 23 24 Ou...

Page 132: ...te Green 9 Alarm Cutoff ACO Input Pair 10 White Brown 10 11 12 13 Minor Audible Alarm Input Pair 1 Brown Black 14 Major Audible Alarm Input Pair 2 Red Black 15 16 Remote Audible Alarm Input Pair 4 Yellow Black 17 Minor Visual Alarm Input Pair 5 Green Black 18 Major Visual Alarm Input Pair 6 Blue Black 19 20 Remote Visual Alarm Input Pair 8 Orange White 21 Input Pair 9 Green White 22 Alarm Cutoff A...

Page 133: ... assignments for ANSI Figure 100 ECU module ANSI Wire wrap Pins Table 7 ECU module Pin Assignments ANSI Function Pin Input from external drive IN 1 Output to external drive OUT1 Input from external drive IN 2 Output to external drive OUT2 Step 2 Connect one end of the wire wrap clock cable to the corresponding wire wrap connector on the ECU module and the other end to the external source of the ti...

Page 134: ...Purpose 75 ohm coaxial cable with a DIN 1 0 2 3 miniature coaxial connector The PID for the BITS IN OUT cable is 15454 M TMGCBL Tools Equipment NTP G253 Install the ECU or ECU S Module on page 79 Prerequisite Procedures As needed Required As Needed Onsite Onsite Remote None Security Level Procedure Step 1 Connect the clock cable to the corresponding ECU module connector using a coaxial cable with ...

Page 135: ...om external drive IN 1 Output to external drive OUT1 Input from external drive IN 2 Output to external drive OUT2 Figure 102 ECU module ETSI BITS connectors Figure 103 ECU module ETSI BITS Connectors Cabling Step 2 Gently push the cable connector into the ECU module connector until you hear a click Perform the following steps to mate the connectors Installing the ONS 15454 M6 Shelf 135 Installing ...

Page 136: ...sed for timing input and output The top connectors are for A BITS 1 timing and the bottom connectors are for B BITS 2 timing In each case the left connector is the input and the right connector is the output The input connectors for timing provide a 75 ohm termination Note Step 3 Connect the other end of the cable to the external source of the timing signal according to Table 8 ECU module Pin Assi...

Page 137: ...TSC or TSCE card switch over If the ECU module is absent you can connect a CAT 5 Ethernet cable to the LAN port on the TNC TNCE TSC TSCE card to create an external LAN connection You can use the same procedure to connect Multishelf Management ports of several chassis in MSM configurations Note To avoid duplex mismatch between EMS or craft terminal port and external LAN switch port auto negotiation...

Page 138: ...nector into the MSM port that corresponds to the TNC TNCE TSC TSCE card in Slot 8 of the ONS 15454 M6 shelf used as the node controller b Plug the other connector into the MSM port that corresponds to the TNC TNCE TSC TSCE card in Slot 8 of the ONS 15454 M6 shelf used as subtending shelf Step 3 Repeat Step 1 and Step 2 to connect the remaining two MSM ports of the ONS 15454 M6 shelf used as the no...

Page 139: ... TSC TSCE card in Slot 8 For more information about the ECU module and MSM ports see the External Connection Units on page 72 Note Procedure Step 1 Complete the necessary task as applicable To connect the ONS 15454 M6 as the node controller and ONS 15454 or ONS 15454 M6 as subtending shelves with Catalyst 3560 complete the DLP G682 Connect the ONS 15454 M6 as the Node Controller in a Mixed Multish...

Page 140: ...3560 product documentation for installation instructions Cross over CAT 5 LAN cables 3 plus 2 for each subtending shelf Tools Equipment NTP G15 Install the Common Control Cards NTP G313 Install and Configure the TNC TNCE TSC or TSCE Card Prerequisite Procedures As needed Required As Needed Onsite Onsite Remote None Security Level The MSM multishelf management ports are present on the ECU module Th...

Page 141: ...nd into Port 2 of the standby Catalyst 3560 c Repeat Step 4a and Step 4b for each subtending shelf in the multishelf configuration using Port 3 to Port 20 on the Catalyst 3560 switches Step 5 To connect an ONS 15454 subtending shelf to the Catalyst 3560 switches complete the following a Using a cross over CAT 5 LAN cable Plug one connector into the front panel of the subtending shelf TCC2 TCC2P TC...

Page 142: ...tion with the ONS 15454 M6 as the Node Controller Installing the ONS 15454 M6 Shelf 142 Installing the ONS 15454 M6 Shelf DLP G682 Connect the ONS 15454 M6 as the Node Controller in a Mixed Multishelf Configuration Using the Catalyst 3560 ...

Page 143: ...ent NTP G15 Install the Common Control Cards NTP G313 Install and Configure the TNC TNCE TSC or TSCE Card Prerequisite Procedures As needed Required As Needed Onsite Onsite Remote None Security Level The MSM multishelf management ports are present on the ECU module The MSM ports located on the left side of the ECU module correspond to the TNC TNCE TSC TSCE card in Slot 1 and the MSM ports located ...

Page 144: ...2P TCC3 card in Slot 11 Plug the other end into the MSM port of the node controller ONS 15454 M6 shelf that corresponds to the TNC TNCE TSC TSCE card in Slot 8 c Repeat Step 2a and 2b for each subtending shelf in the multishelf configuration using the remaining MSM ports on the node controller ONS 15454 M6 shelf Step 3 To connect an ONS 15454 subtending shelf to the ONS 15454 M6 subtending shelf c...

Page 145: ...subtending shelves using the Catalyst 3560 Purpose Two Cisco Catalyst 3560 switches must be installed in same rack as the node controller shelf refer to the Cisco Catalyst 3560 product documentation for installation instructions Cross over CAT 5 LAN cables Tools Equipment NTP G15 Install the Common Control Cards NTP G313 Install and Configure the TNC TNCE TSC or TSCE Card Prerequisite Procedures I...

Page 146: ...tor into the front panel of the node controller TCC2 TCC2P TCC3 card in Slot 7 Step 2 Using a cross over CAT 5 LAN cable a Plug one connector into Port 1 of the standby Catalyst 3560 b Plug the other connector into the front panel of the node controller TCC2 TCC2P TCC3 card in Slot 11 Step 3 Using a cross over CAT 5 LAN cable a Plug one connector into Port 23 of the active Catalyst 3560 b Plug the...

Page 147: ...3560 b Using a cross over CAT 5 LAN cable Plug one connector into the front panel of the subtending shelf TCC2 TCC2P TCC3 card in Slot 11 Plug the other connector into Port 2 of the standby Catalyst 3560 c Repeat Step 5a and 5b for each subtending shelf in the multishelf configuration using Port 3 to Port 20 on the Catalyst 3560 switches Step 6 To daisy chain up to six Catalyst 3560 switches use a...

Page 148: ... the ONS 15454 as the Node Controller Step 7 Return to your originating procedure NTP Installing the ONS 15454 M6 Shelf 148 Installing the ONS 15454 M6 Shelf DLP G683 Connect the ONS 15454 as the Node Controller in a Mixed Multishelf Configuration ...

Page 149: ...ond to the TNC TNCE TSC TSCE card in Slot 8 For more information about the ECU module and MSM ports see the External Connection Units on page 72 Note Procedure Step 1 Complete the necessary task as applicable To upgrade the existing ONS 15454 multishelf configuration that has the Cisco Catalyst 2950 switches complete the DLP G687 Upgrade the ONS 15454 Multishelf with the Catalyst 2950 Switch Confi...

Page 150: ...ort 21 of the active and standby Catalyst 2950 a Remove the cross over CAT 5 LAN cable from Port 21 of the active Catalyst 2950 b Remove the cross over CAT 5 LAN cable from Port 21 of the standby Catalyst 2950 Step 2 Connect the extended Catalyst 3560 active and standby to the Catalyst 2950 a Using a cross over CAT 5 LAN cable Plug one connector to Port 1 of the extended Catalyst 3560 active Plug ...

Page 151: ...t of the subtending ONS 15454 M6 shelf that corresponds to the TNC TNCE TSC TSCE card in Slot 1 Plug the other connector into Port 3 of the active Catalyst 3560 b Using a cross over CAT 5 LAN cable Plug one connector into the MSM port of the subtending ONS 15454 M6 shelf that corresponds to the TNC TNCE TSC TSCE card in Slot 8 Plug the other connector into Port 3 of the standby Catalyst 3560 c Rep...

Page 152: ...ng IOS commands complete the NTP G298 Configure a Cisco Catalyst 2950 or Catalyst 3560 Active and Standby for a ONS 15454 Multishelf Node Step 7 Return to your originating procedure NTP Installing the ONS 15454 M6 Shelf 152 Installing the ONS 15454 M6 Shelf DLP G687 Upgrade the ONS 15454 Multishelf with the Catalyst 2950 Switch Configuration ...

Page 153: ...ing shelves and when there are more than 12 subtending shelves Note The CTC in ONS 15454 M6 shelf view displays the three ports of the MS ISC card and EMS and circuit ports present on the ECU Note Procedure Step 1 Disconnect the ONS 15454 subtending shelf from the EAPs a Remove the cross over CAT 5 LAN cable connecting the ONS 15454 subtending shelf from the SSC8 port of the right EAP b Remove the...

Page 154: ...454 M6 subtending shelf to the Catalyst 3560 switches complete the following a Using a cross over CAT 5 LAN cable Plug one connector into the MSM port of the subtending ONS 15454 M6 shelf that corresponds to the TNC TNCE TSC TSCE card in Slot 1 Plug the other connector into Port 3 of the active Catalyst 3560 b Using a cross over CAT 5 LAN cable Plug one connector into the MSM port of the subtendin...

Page 155: ...st 3560 Active and Standby for a ONS 15454 Multishelf Node Step 7 Return to your originating procedure NTP NTP G264 Perform the ONS 15454 M6 Shelf Installation Acceptance Test Use this procedure to perform a shelf installation acceptance test for the ONS 15454 M6 Purpose Installing the ONS 15454 M6 Shelf 155 Installing the ONS 15454 M6 Shelf NTP G264 Perform the ONS 15454 M6 Shelf Installation Acc...

Page 156: ...S Module on page 79 NTP G524 Install the Power Modules in the ONS 15454 M6 Shelf on page 85 NTP G255 Install the LCD Module in the ONS 15454 M6 Shelf on page 96 NTP G256 Install Power and Ground to the ONS 15454 M6 Shelf on page 100 NTP G257 Install the Fan Tray Assembly in the ONS 15454 M6 Shelf on page 118 NTP G313 Install and Configure the TNC TNCE TSC or TSCE Card NTP G308 Connect the ONS 1545...

Page 157: ...quipment None Prerequisite Procedures Required Required As Needed Onsite Onsite Remote None Security Level Procedure Step 1 Make sure all external wiring connections on the ECU module that is power ground alarms and so on are secure If a wire or cable is loose return to the appropriate procedure in this chapter to correct it Step 2 Return to your originating procedure NTP DLP G579 Measure DC Volta...

Page 158: ...n the RET1 and the red lead on the 48 V point Verify a reading between 40 5 VDC and 57 6 VDC If there is no voltage check the following and correct if necessary Battery and ground are reversed to the shelf Battery is open or missing Return is open or missing Step 3 Repeat Step 1 and Step 2 for the RET2 and 48 V of the redundant power supply input Step 4 Return to your originating procedure NTP NTP...

Page 159: ...TSC TSCE card in Slot 1 of the ONS 15454 M6 shelf used as subtending shelf When connecting two shelves using the cross over cables it is possible to have shelves not having controller cards in same slots Use corresponding MSM ports according to the controller card slots Note Step 2 Repeat Step 1 to connect the remaining two MSM ports of the ONS 15454 M6 shelf used as the node controller to the sub...

Page 160: ...t corresponds to the TNC TNCE TSC TSCE card in Slot 1 of the ONS 15454 M6 shelf used as the node controller b Plug the other connector into the MSM port that corresponds to the TNC TNCE TSC TSCE card in Slot 1 of the ONS 15454 M6 shelf used as subtending shelf When connecting two shelves using the cross over cables it is possible to have shelves not having controller cards in same slots Use corres...

Page 161: ...ed on the ONS 15454 M6 shelf to orient the air flow in a specific direction Air deflectors can be mounted in different positions to control the air flow Front to Front Only ETSI rack Front to Back For ANSI and ETSI racks Front to Top Only ETSI rack In an ANSI rack the air deflectors are mounted only on the 23 inch rack configuration Installing the ONS 15454 M6 Shelf 161 Installing the ONS 15454 M6...

Page 162: ...can be installed in any empty slot in the shelf CTC does not detect blank cards The following figure shows the faceplate of the blank card filler Figure 114 Blank Card Filler Faceplate Air Filter The ONS 15454 M6 contains a preinstalled reusable air filter 15454 M6 FTF on the right side of the shelf The reusable filter is made up of a gray open cell polyurethane foam that is specially coated to pr...

Page 163: ...ns in the ONS 15454 M6 shelf depending on the I O cards used CTC allows you to choose a cooling profile for ONS 15454 M6 shelf You can change the cooling profile in Shelf view Provisioning General Voltage Temperature pane in CTC The supported cooling profile values are Low Medium and High The default cooling profile value is High You can change the cooling profile depending on the cards used in th...

Page 164: ... 10G 40 DMX C 40 DMX L 32 MUX O 40 MUX C 40 MUX L AR_MXP AR_XP GE XP MXP_2 5G_10E MXP_2 5G_10G 40 WXC C 40 WXC L 80 WXC C AD 1B AD 1C MXP_2 5G_10X MXP_MR_10DME MXP_MR_10DMEX MXP_MR_2 5G MXPP_MR_2 5G AD 2C AD 4B AD 4C MD 4 MMU OPT RAMP C OPT RAMP CE OTU2_XP RAMAN COP RAMAN CTP OPT AMP 17 C OPT AMP C OPT AMP L OPT BST OPT BST E OPT BST L OPT EDFA 17 OPT EDFA 24 OPT PRE OSCM OSC CSM PSM TDC CC TDC FC...