Step 6
Apply the star ring terminal end of the grounding cables to the front ID doors.
Step 7
Connect the other round terminal of the grounding cable to the ground port on the chassis, as shown in
. Tighten the M4 screw to 9 to 12 in-lb (1.01 to 1.35 N-m) of torque.
Installing Cable Management Frames
You install the middle cable management frame and then install the lower and upper frames on the middle
frame. After installing the cable management frames on the left and right sides of the front of the chassis, you
install the top hood, and then tighten the screws holding all the frames to the chassis.
If you are installing the optional front doors on the chassis, you must have the cable management frames
already installed because they hold the front doors to the chassis.
Before You Begin
•
The chassis is installed and secured to the rack or cabinet.
•
You have the following tools and equipment:
◦
Phillips torque screwdriver (customer supplied).
◦
Following frames and screws (shipped with the switch):
◦
Two cable management upper side frames
◦
Two cable management middle side frames
◦
Two cable management lower side frames
◦
One cable management top hood frame
◦
36 M4 x 13-mm, flat-head, Phillips screws
Procedure
Step 1
Attach the middle cable management frames as follows:
Cisco Nexus 7718 Switch Site Preparation and Hardware Installation Guide
40
OL-30453-01
Installing the Chassis
Installing Cable Management Frames