Figure 16: Connecting the Grounding Cable to the Ground Port on the Cisco Nexus 7706 Chassis
Grounding Cable connected to Ground port on the
chassis
2
Front ID Door
1
Use the ground port in the back of the Cisco Nexus 7706 chassis for primary earthing when you use the front
ground port for grounding the removable door.
Note
Installing Cable Management Frames onto the Chassis
Before you begin
• The chassis must be installed and secured to the rack.
• You must have the following tools and equipment:
• Manual Phillips screwdriver with torque capability (customer supplied).
• The following frames and screws (shipped with the switch):
• Two cable management side frames
• One cable management top hood frame
• 22 M4 x 12-mm, flat-head, Phillips screws
Cisco Nexus 7706 Hardware Installation Guide
OL-31330-01
36
Installing the Switch Chassis
Installing Cable Management Frames onto the Chassis