Steps
To install a PM slot cover in an AC or DC power tray, follow these steps:
Step 1
Attach the ESD-preventive wrist strap to your wrist and connect its leash to the ESD jack on the front side of the FCC
(see
Preventing Electrostatic Discharge, on page 11
). You can also connect the ESD-preventive wrist strap leash to any
bare metal surface on the FCC.
Step 2
Align the PM slot cover with the empty PM slot in the power tray.
Step 3
Insert the two tabs on the top of the PM slot cover into the two holes on the top of the PM slot.
Step 4
Push in the top of the PM slot cover gently until it clicks into place.
Figure 35: PM Slot Cover on the Front of a Power Tray
—
DC Power Tray Shown
Installing AC Input Power Cords
This section describes how to connect the AC input power cords to the power modules and includes the
following topics:
Prerequisites
Ensure that there is a readily accessible disconnect device incorporated in the building's installation wiring.
Before connecting AC input power cords to the power system, make sure that the input power cords are
not energized.
Caution
Cisco Network Convergence System 6000 Fabric Card Chassis Hardware Installation Guide
53
Installing the Power Components
Installing AC Input Power Cords