35
Switch Installation
Installing and Removing SFP Modules
Figure 24
Wall-Mounting the Cisco IE-3010-16S-8PC
After the switch is mounted on the wall:
Wire the switch to a power source. See
Power Supply Installation, page 47
For configuration instructions about using the CLI setup program, go to
Configuring the Switch with the CLI Setup
Connect the switch ports. See the
Connecting Devices to the Ethernet Ports, page 44
Installing and Removing SFP Modules
This section presents procedures to install and remove fiber-optic and 1000BASE-T SFP transceiver modules.
Installing SFP Modules
These sections describe how to install and remove SFP modules. SFP modules are inserted into SFP module slots on the
front of the switch. Field-replaceable SFP modules provide the uplink interfaces, send (TX) and receive (RX).
You can use any combination of rugged SFP modules. See
for a list of supported modules. Each SFP
module must be of the same type as the SFP module on the other end of the cable, and the cable must not exceed the
stipulated cable length for reliable communications. See
for cable stipulations for SFP module
connections.
Ci
sc
o
Sw
it
ch
2500
Se
ri
es
Co
n
n
e
c
ted
Gr
id
207557
1