Chapter 3 Switch Installation
Preparing for Installation
3-10
Catalyst 3560 Switch Hardware Installation Guide
78-16057-01
•
Airflow around the switch and through the vents is unrestricted.
•
Temperature around the unit does not exceed 113°F (45°C).
Note
If the switch is installed in a closed or multirack assembly, the
temperature around it might be greater than normal room temperature.
Verifying Package Contents
Note
Carefully remove the contents from the shipping container, and check each item
for damage. If any item is missing or damaged, contact your Cisco representative
or reseller for support. Return all packing material to the shipping container, and
save it.
The switch is shipped with these items:
•
This
Catalyst 3560 Switch Hardware Installation Guide
•
Where to Find the Catalyst 3560 Documentation
flyer
•
AC power cord (AC-powered switches)
•
One RJ-45-to-DB-9 adapter cable
•
Mounting kit containing:
–
Four rubber feet for mounting the switch on a table
–
Two 19-inch rack mounting brackets (also used for wall mounting)
–
Six Phillips flat-head screws for attaching the brackets to the switch
–
Four Phillips machine screws for attaching the brackets to a rack
–
One cable guide and one black Phillips machine screw for attaching the
cable guide to one of the mounting brackets
–
One redundant power system (RPS) connector cover (for wall mounting)
–
Two Phillips pan-head screws (for attaching the RPS cover)
–
Four Phillips truss-head screws (for wall-mounting brackets)
Summary of Contents for Catalyst 3560
Page 6: ......
Page 12: ...Contents x Catalyst 3560 Switch Hardware Installation Guide 78 16057 01 ...
Page 23: ...xxi Catalyst 3560 Switch Hardware Installation Guide 78 16057 01 Preface Conventions ...
Page 24: ...Preface Conventions xxii Catalyst 3560 Switch Hardware Installation Guide 78 16057 01 ...
Page 25: ...xxiii Catalyst 3560 Switch Hardware Installation Guide 78 16057 01 Preface Conventions ...