Verifying System Startup
When power is applied to the chassis, power is provided to the upper and lower fan trays, and every installed
card.
Light emitting diodes (LEDs) on all circuit cards and daughter cards indicate operating status.
As the system progresses through its boot process, LED activity will eventually occur on all cards. Allow
several minutes to elapse prior to checking the status LEDs on the various cards.
Important
Checking PFU Status
The blue LEDs above the circuit breakers on each PFU should all be ON.
If all of the LEDs on a PFU are OFF, check the following:
•
The PFU is firmly seated in the midplane connectors.
•
All circuit breakers on the PFU are set to ON.
•
All circuit breakers for power feeds from the local power distribution panel are ON.
•
-48 VDC power is available from the PDF to the local PDP.
If any LED is OFF, check the following:
•
PFU circuit breaker is ON.
•
Voltage is present at corresponding input terminal at rear of the PFU.
•
Cable connection at PFU terminals is secure.
•
Circuit breaker for the power feed from the local PDP is ON.
•
Cable connection at the PDP terminal is secure.
Checking Status LEDs on MIOs
The table below identifies the operational and transitional states for LED indicators on an MIO /UMIO card.
Table 16: MIO/UMIO/ Operating States and Status LED Indicators
Notes
LED State
LED Color
Label
Card Transition
ASR 5500 Installation Guide
89
System Power-up
Verifying System Startup
Summary of Contents for ASR 5500
Page 12: ...ASR 5500 Installation Guide xii Contents ...
Page 16: ...ASR 5500 Installation Guide xvi About this Guide Contacting Customer Support ...
Page 40: ...ASR 5500 Installation Guide 24 Technical Specifications Chassis Grounding ...
Page 74: ...ASR 5500 Installation Guide 58 Card Installation Save Shipping Cartons ...
Page 88: ...ASR 5500 Installation Guide 72 MIO Port Cabling Cleaning Fiber Optic Connectors ...
Page 112: ...ASR 5500 Installation Guide 96 System Power up show leds Command ...
Page 130: ...ASR 5500 Installation Guide 114 Initial System Configuration Additional Configuration Tasks ...
Page 164: ...ASR 5500 Installation Guide 148 Replaceable Components Returning Failed Components ...
Page 186: ...ASR 5500 Installation Guide 170 Console Port to Cisco Server Cabling Configuration ...
Page 192: ...ASR 5500 Installation Guide 176 RMA Shipping Procedures Rear Cards ...