
Make sure that you save this small plastic cover, in case you want to use the
handset without the belt clip.
Note
• Printed compliance document.
You need the label on the box during handset registration.
Power Requirements
The base station requires one of these power sources:
• Power over Ethernet (PoE) - minimum IEEE 802.3: Power class 2 (3.84 – 6.49W)
• Power adapter specific to your region with a USB-to-power jack cable. The power adapter is plugged
into an electrical outlet.
The handset is powered by a 3.7V, 1000mAh, 4.1Wh, Lithium ion battery.
The handset charger power cable plugs into the regional power adapter, and the power adapter must be plugged
into an electrical outlet.
Install the Base Station
When the base station connects to the network, the LEDs light to indicate the network status:
• Green—Connected.
• Amber—Connection in progress.
• Red, flashing—Can't connect to the network.
• Red, solid—Network connection resetting.
Use this procedure to check that the base station and the network can communicate with each other, before
you mount the base station in the chosen location.
Before you begin
The base station requires:
• Power over Ethernet (PoE) or a power adapter
• LAN connection
• An IP address assigned by DHCP in the network
Procedure
Step 1
Plug one end of the Ethernet cable into the base station.
Cisco IP DECT 6800 Series Administration Guide
25
Hardware Installation
Power Requirements