A-21
Cisco XR 12416 and Cisco XR 12816 Router Chassis Installation Guide
OL-17440-01
Appendix A Repackaging the Router
Repackaging the Routers
Repackaging the Vertical Cable-Management Troughs
To repackage the vertical cable-management troughs, follow these steps:
Step 1
Place the six screws in a plastic bag.
Step 2
Insert the trough into the long plastic bag.
Step 3
Put the foam cap on each end of the trough.
Step 4
Place the trough and the bag of screws into the corrugated carton.
Step 5
Close and seal the carton.
Step 6
Repeat
Step 1
through
Step 5
for the second trough.
Repackaging the Center-Mount Rack-Mounting Brackets
If you used the optional center-mount rack-mounting brackets to install the router
in the equipment rack, you must repackage the brackets.
To repackage the brackets, follow these steps:
Step 1
Remove the brackets from the rack and place all of the screws in a plastic bag.
Step 2
Turn the brackets so the screw rails are interlocked.
Step 3
Hold the brackets together and put the two foam caps on the ends of the brackets.
Step 4
Place the brackets and the bag of screws into the corrugated carton.
Step 5
Close and seal the carton.