99
Instruction Manual
AFQm
16
Connect the flat belts, Hall-effect sensors and fans.
17
Mount the top cover.
4�5 Nm
18
Connect, power and start the
AFQm
.
19
Check the correct operation of the fans.
Follow
steps 18
and
19
, section
“10.3. CHANGE OF COOLING FANS: AFQm OF 30A”
10�6�- CHANGE OF COOLING FANS: AFQm OF 100A WALL
Table 47:Tools needed (AFQm-xxx-100M)
Tools needed
Fan assembly replacement
AFQm-xxx-100x, Code: 920124
2
Screwdriver for
PH2
head screws
25
Screwdriver for
Torx 25
head screws
4
Screwdriver for
Allen 4
head screws
5
Screwdriver for
Allen 5
head screws
10
Screwdriver for
Hexagonal 10 mm
head screws
To proceed to change the set of fans:
1
Place the
AFQm
in
STOP
mode and disconnect the device from the power. If necessary, disconnect
all the connection cables and short-circuit the current transformers.
2
Wait for 1 minute for the capacitors to discharge before opening the device.
3
Remove the 6 screws from the front cover.
2
3
3
Figure 101:AFQm-xxx-100M Change of cooling fans (Step 3)�
Summary of Contents for AFQm-3WF-030M-480
Page 1: ...INSTRUCTION MANUAL Active Parallel Multi Function Filter AFQm M217B01 03 21A...
Page 2: ...2 AFQm Instruction Manual...
Page 111: ...111 Instruction Manual AFQm 608 812 1755 665 465 1890 Figure 108 Dimensions Cabinet type AFQm...
Page 113: ...113 Instruction Manual AFQm 14 CE CERTIFICATE...
Page 114: ...114 AFQm Instruction Manual...
Page 115: ...115 Instruction Manual AFQm...