Cimarron Rookie Cable Frame Quick Start Manual Download Page 1

Cimarron 70x12x12 Rookie Cable Frame

The following parts are included for your frame.  Check to be sure you have all the parts listed.

 

PART

       

QTY

A

2-WAY CORNERS

10

You will need an area 72' x 17'6” for your frame and 
an additional 10' at each end for the support ropes.

It is recommended that you mark off this area before
starting.

Nut Setter Bit Included

B

17' 

5

” CABLES

12

BB 28” PIPE

10

C 16” PIPES W / RING

5

D 64” PIPES W / REDUCDED END

15

E

60” PIPES

15

F

SMALL U-BOLTS

24

G SELF DRILLING SCREWS

10

H CARABINERS

66

J

ROPE STAKES

6

K

21' SUPPORT ROPES

6

L

GROUND STAKES

10

M TURNBUCKLES

12

If you did not receive the 60” and 64” pipes for the frame legs, but received 10' lengths of EMT from Home Depot

or purchased them on your own, they represent the legs.

CONSTRUCTING YOUR FRAME

1. Lay out the twelve cables (B).  At one end of each cable, flip up 3” and attach a small u-bolt (F) to leave a loop.

Attach a carabiner (H) to the loop.

2. At the other end, put the cable through the closed end of a turnbuckle (M).  Flip up 3” and attach a small u-bolt

(F) to lock the turnbuckle in place.  Each cable assembly should be about 17'7” long.  Connect the rest of the
cable assemblies the same way.

3. Lay out two of the 2-way corners (A) about 12' apart at one end of your frame location.

4. Measure 17'7”  from the first 2-way corners (A) and lay out two more 2-way corners (A).  Continue to lay out

the corners every 17'7”  to the end of the frame.

5. Assemble the arch top by attaching a 64” pipe (D), to a 16” pipe with a ring in the middle (C) pointing towards

the ground, and attach a 60” pipe (E).  Repeat for all arches.

6. Assemble the legs by attaching a 64” pipe (D) to a 60” pipe (E) and then a 28” pipe (BB).

7. Complete assembling the arches by attaching the top of the arch to two of the corners (A), with the ring on the

16” pipe (C) pointing towards the ground.

8. Lay the arches on the ground so that the bottom of the legs of the first arch are where you want the end of the

frame.  Follow with each additional arch being 17'7” apart.

9. While on the ground, attach the carabiner end of three cable assemblies to the rings on the top of the first arch.

Attach the turnbuckles at the other end of the cable assemblies to the rings on the top of the second arch.
Attach the rest of the cables the same way between the rest of the arches.

10. Tie the support ropes (K) to each corner on the end arch pieces (A) and to the center arch piece (C).
11. Stand up one end arch and about 10' behind the arch, drive three stakes (J) into the ground and attach the

support ropes (K) to the stakes (J) to hold the arch in place.

12. Stand up the rest of the arches, one at a time.  Set the bottoms in place so that the cables are taunt.
13. Drive three more stakes (J) into the ground at the other end of your frame.  Attach the support ropes (K) so that

the entire frame is stabilized.

072420

1 of 2

Reviews: