Page 1: ...Page 1 4871 MOT V1 MINING OUTLET TESTER PATENT PENDING NO AU2017902878 PRODUCT MANUAL ...

Page 2: ...t Function 7 2 3 Applied Standards 8 2 4 Features Specification 8 3 TESTING INSTRUCTIONS 10 3 1 EARTH LEAKAGE LOCKOUT TEST ELL 11 3 2 FROZEN CONTACT TEST FC 13 3 3 EARTH CONTINUITY EC 15 3 4 REMOTE START STOP 17 3 5 EARTH LEAKAGE TEST EL 18 3 6 PHASE INFORMATION 22 4 SERVICING 24 ...

Page 3: ...ment must only be used by a competent and trained person with adequate certification such as a licenced electrician CIE will not accept liability for any damage or injury caused by misuse or non compliance with the instructions It is important to read and to understand the safety rules contained in the instructions provided DANGER is reserved for conditions and actions that are likely to cause ser...

Page 4: ...is instrument is to be used only for the intended applications and in safe conditions This instrument and testing must be performed by trained professionals with appropriate licences Conduct all tests according to the safety procedures provided by your workplace Do not remove internal the sealed front cover of the instrument there are dangerous voltages present and this may void the manufacturer w...

Page 5: ...pt to use this instrument in wet conditions CAUTION For safety reasons only use accessories that are designed to be used with this instrument and recommended by CIE Use a damp cloth and a mild detergent to clean the instrument Do not use abrasive materials or solvents eg methylated spirits ...

Page 6: ...Page 6 2 FEATURES 2 1 Instrument Layout 1 Instrument On Off 2 Battery Voltage Indication 3 Main Control Touch Screen LCD 4 Battery Charging socket 5 Earth Leakage Current Selector Switch 1000V 415V ...

Page 7: ...ght This instrument is supplied with an Appliance Inlet DS3 1000V 3PE 2Aux 32A where the test device will connect via test lead 2 2 Test Function 4871 MOT V1 performs the following 6 test functions 1 Earth Leakage Lockout 2 Frozen Contact 3 Earth Continuity 4 Remote Start and Stop 5 Earth leakage with trip time ...

Page 8: ...IEC60529 IP54 Instrument in Storage 0529 IP64 2 4 Features Specification 4871 MOT V1 comprises the following features High speed User friendly Touch screen operation for all tests Live battery voltage information Phase information o Phase Phase voltage Phase Earth voltage o Phase Rotation Phase status information Earth continuity short circuit and open circuit tests ...

Page 9: ...ith 1000V 415 240 and 110V via variety of different current levels Enclosed in a sturdy carry case for enhanced portability and durability Light weight and long battery life for continuous operation 5 hour Size 387 x 394 x 260 mm Weight 9 5 kg including accessories Patented Design ...

Page 10: ...Page 10 3 TESTING INSTRUCTIONS PRESS ENTER TO PROCEED TO MAIN TEST SCREEN Main Test Screen Main Menu ...

Page 11: ...Page 11 3 1 EARTH LEAKAGE LOCKOUT TEST ELL PRESS this button to enter Earth Leakage Lockout Select your Pilot Mode according to the switchboard setup Select Phase for ELL test ...

Page 12: ...r values under selected phase to conduct the ELL test This shows ELL test is On and also will display selected resistance and phase In 9K and 900K continuity will be made healthy Attempt to close the contactor to prove the ELL relay is stopping the contactor from closing Continuity is not made healthy in 3 3M ...

Page 13: ...IS CONNECTED TO THE MOT AND THE OUTLET TO BE TESTED AS THE MOT S MARECHAL INLET WILL BE ENERGISED DURING THIS TEST PRESS this button to enter the FC test screen DANGER INLET PINS ARE NOW LIVE After entering test Voltmeter and Potentiometer will activate for testing Select a phase ...

Page 14: ...and will inject up to 120VAC All workplace safety procedures should follow during this test Increase the voltage slowly around 3 volts per second until circuit breaker trips Press Reset Test to reset the test and select different Phase After completing test return Frozen Contact Voltage Potentiometer to Zero Press MAIN MENU to terminate FC test and go back to main test screen ...

Page 15: ...Page 15 3 3 EARTH CONTINUITY EC Press this button to enter Earth continuity Select your Pilot Mode according to the switchboard setup ...

Page 16: ... 16 Earth Continuity Test Screen Press Healthy to activate then press Open for Open Earth continuity test Press Healthy to rest then press short for Short Earth continuity test To exit test press MAIN MENU ...

Page 17: ...to enter remote start Select your Pilot Mode according to the switchboard setup Please note IPM relays do not support remote start in diode mode Wait for Earth continuity RTM to be healthy then Press start wait for contactor to close then press Stop ...

Page 18: ...RESS this button to enter Earth Leakage test When conducting tests do not touch any exposed metalwork associated with the installation In certain tests this metalwork may become live for the duration of test Select remote or local start ...

Page 19: ... earth continuity from Diode or RTM refer to board manufacture if there is no earth continuity select Diode Remote Local Close the contactor to energise the outlet under test Earth Leakage phase selection test screen ...

Page 20: ...nt level Incorrect selection can cause variation in trip time Check correct voltage is selected Check current and voltage for EL test before pressing enter to start the test Once test finishes trip time will display in milliseconds ...

Page 21: ...at the test and discard any blatantly inconsistent readings These occur occasionally and are caused by noise effecting the signal Examples Phase A Trip Times 84ms 1247ms Discard 85ms 79ms Phase B Trip Times 90ms 87ms Phase C Trip Times 4ms Discard 79ms 78ms 82ms After completing Earth leakage tests return both Earth Leakage Current Selector Switches to OFF ...

Page 22: ...de input phase to phase voltage and phase to earth voltage This test requires main power supply to be on and contactor to be closed after appropriate earth continuity mode selection Before pressing enter to test make sure all Earth Leakage Current Selector Switches are turned off and contactor is closed ...

Page 23: ...s Phase information is not live data It is a snapshot taken over a few wave forms If 3 phases are not present or voltage is fluctuation too much No 3 phase connection will be displayed Phase rotation is currently fully operational for 1000 volts and 440 415 phase rotation is under development and we expect it to be incorporated soon Phase to phase voltage are a calculated value based on the single...

Page 24: ...Po4 battery that requires a special charger Do not use any other battery charger to charge this device other than the charger supplied Otherwise this can cause damage to the battery and the instrument It is recommended to have this instrument be recalibrated every 6 months For any functionality issue with this instrument please contact the manufacturer for a solution ...