Chromalox CHS-1080 Installation, Operation And Renewal Parts Identification Download Page 9

9

5.

Connect the ohmmeter between controller terminals W and R and
raise the set point of the controller above the actual pressure being
measured. The ohmmeter should read the full value of the poten-
tiometer measured in step 4 (135 ohms for an L91B).

6.

Slowly lower the set point of the controller while observing the
ohmmeter reading. The resistance should drop to zero at some set
point below the actual pressure.

7.

An approximation of the proportioning range can be made by
observing the change in set point required for a resistance change
from zero to full value.

8.

When the controller is operating properly, reconnect the wires,
replace the cover. tighten the cover screw, and reset the controller
to the desired value.

9.

Reconnect power to the controlled motor.

BOILER SEQUENCER (5 STEP)
RECYCLE FEATURE (See Figure 19)

The step control is designed to drop out all contactors when con-

trol circuit is interrupted. On resumption of power, the camshaft rotates
to the counter-clockwise (ccw) limit, opening all the load switches.
The recycle relay then energizes, pulling in the load contact, and final-
ly the camshaft rotates clockwise (cw) to the position called for by the
pressure controller energizing, in sequence, the required load stages.

TESTING OPERATION OF SEQUENCER (See Figure 20)
1.

With boiler off, remove wiring from pressure control on sequencer
low voltage terminal board.

2.

Turn on boiler to supply the voltage to sequencer. Short terminal R
and B for counter-clockwise rotation and terminal R and W for
clockwise rotation.

3.

If sequencer operates under this test procedure, but when rewired
to pressure controller, does not function, check pressure control.
Note that wiring is W-B and B-W-R-R between sequencer and
pressure control.

SEQUENCE REVERSER (See Figure 21)
GENERAL:

Sequence Reverser is an automatic switching device which is

interposed on an electric boiler between the proportional sequence
controller and the heating element contactors. The device is periodi-
cally actuated to alter the operating sequence of each of the heating
elements, thereby increasing the overall reliability of the boiler.

DETAILS:

The Sequence Reverser consists of an eight-day timer set up for

four days on and four days off which energizes and de-energizes dou-
ble throw relays which are wired to reverse the “firing” order of the
heating element contactors with each operation of the timer.

OPTIONAL EQUIPMENT FOR CHROMALOX STEAM BOILERS (cont’d.)

Main Scale
Adjusting Screw

Proportioning Range
Adjusting Screw

Main Scale
Setting
Indicator

Ohmmeter

Setpoint

R
W
B

W     R    B

Increases
to 15 Ohms

Note:

 Terminals are not labeled, but screw-heads are

color-coded red (R), white (W) and blue (B).

Figure 18

Figure 19 – Five Step Sequencer

Figure 20

Typical Wiring Diagram for 5 Step Motor Driven Sequencer

Summary of Contents for CHS-1080

Page 1: ...t Boilers INSTALLATION CAUTION To avoid electrical shock hazard boilers must be suitably grounded to earth NOTE Chromalox boilers are pre tested before shipment no internal piping or wiring is necessa...

Page 2: ...34 40 2 NPT 1 NPT 1 NPT CHS 720 thru CHS 810 76 58 45 47 94 6 1 1 2 38 44 2 NPT 1 NPT 1 NPT CHS 945 thru CHS 1080 76 68 45 47 94 6 1 1 2 38 44 2 NPT 1 NPT 1 NPT CHS 1215 thru CHS 1620 86 76 56 50 98...

Page 3: ...ety feature that prevents a dangerous situ ation should a contactor or relay stick Activation of the shunt trip device will completely disconnect the boiler from the power sup ply See Figure 7 3 Since...

Page 4: ...Groups To Other Heater Groups Typical 3 Phase Heater Group To Power Curcuit Relay Step Sequencer Figure 9 Power Circuit Detail Low Water Probe 120 Volt Control Voltage Hi Limit Control Electronic Resi...

Page 5: ...he other is used as a high limit control To deter mine the difference in the controls the high limit has a manual reset lever on top of the case Also there is no differential scale present 2 On all co...

Page 6: ...sure Do not push reset until boiler has filled with water The use of chemical boiler cleaning compounds in these boilers voids all warranties unless approved by manufacturer Some compounds will damage...

Page 7: ...ated on the inside of the control panel to boiler normal if the boiler is to be shut down each night Set it to 24 hour duty if the boiler is to remain on continuously 24 hours per day except during bl...

Page 8: ...of the controlled medium will cause a change in the number of elements energized to compensate for it thus keeping the pressure constant This process is called modula tion PROPORTIONAL PRESSURE CONTR...

Page 9: ...boiler off remove wiring from pressure control on sequencer low voltage terminal board 2 Turn on boiler to supply the voltage to sequencer Short terminal R and B for counter clockwise rotation and ter...

Page 10: ...gized for safety When power resumes the control will re stage the loads one at a time Refer to the diagram for visual description of progressive sequencing PROGRESSIVE SEQUENCING The solid state seque...

Page 11: ...nge 5 Thoroughly clean boiler flange of all foreign material Be certain no part of old gasket remains on boiler flange 6 Apply Slic Tite Gasket Compound or equal to both surfaces of new gasket supplie...

Page 12: ...amp 128 118530 003 Power Circuit Fuse Class J 100 amp 128 118530 004 Valves and Gauges Description Part Number Pressure Gauge 3 1 2 160 344 118529 024 Gauge Glass Assembly 347 118537 002 Sight Glass 3...

Reviews: