OPERATION (cont’d.)

Figure 16 – Typical Wiring for Automatic Blowdown System

Now turn the wheel on the large timer until the “off” tab passes the

“time now” arrow. The “boiler normal” light should go out and the
valve should begin to open. Once the “valve open” light goes on, the
valve should remain open for a few seconds and then automatically
close. The “drain valve closed” light should light and the “boiler nor-
mal” light should remain off.

NORMAL OPERATION –

Set the “Boiler Normal/24-hour duty”

switch located on the inside of the control panel to “boiler normal” if
the boiler is to be shut down each night. Set it to “24-hour duty” if the
boiler is to remain on continuously 24 hours per day (except during
blowdown).

Set the tabs on the large timer for the ON and OFF times desired

for the boiler, screw in the small black day-skip tabs if the boiler is to
remain off for the weekend, etc.

If the boiler is on 24-hour duty set the OFF tab for the time that is

desired for blowdown. The ON tab can be ignored, but must remain on
timer.

The small time delay relay controls the time that the drain valve

remains open. Counterclockwise decreases, clockwise increases blow-
down time. Time must be adjusted by trial.

Summary of Contents for CHS-1080

Page 1: ...t Boilers INSTALLATION CAUTION To avoid electrical shock hazard boilers must be suitably grounded to earth NOTE Chromalox boilers are pre tested before shipment no internal piping or wiring is necessa...

Page 2: ...34 40 2 NPT 1 NPT 1 NPT CHS 720 thru CHS 810 76 58 45 47 94 6 1 1 2 38 44 2 NPT 1 NPT 1 NPT CHS 945 thru CHS 1080 76 68 45 47 94 6 1 1 2 38 44 2 NPT 1 NPT 1 NPT CHS 1215 thru CHS 1620 86 76 56 50 98...

Page 3: ...ety feature that prevents a dangerous situ ation should a contactor or relay stick Activation of the shunt trip device will completely disconnect the boiler from the power sup ply See Figure 7 3 Since...

Page 4: ...Groups To Other Heater Groups Typical 3 Phase Heater Group To Power Curcuit Relay Step Sequencer Figure 9 Power Circuit Detail Low Water Probe 120 Volt Control Voltage Hi Limit Control Electronic Resi...

Page 5: ...he other is used as a high limit control To deter mine the difference in the controls the high limit has a manual reset lever on top of the case Also there is no differential scale present 2 On all co...

Page 6: ...sure Do not push reset until boiler has filled with water The use of chemical boiler cleaning compounds in these boilers voids all warranties unless approved by manufacturer Some compounds will damage...

Page 7: ...ated on the inside of the control panel to boiler normal if the boiler is to be shut down each night Set it to 24 hour duty if the boiler is to remain on continuously 24 hours per day except during bl...

Page 8: ...of the controlled medium will cause a change in the number of elements energized to compensate for it thus keeping the pressure constant This process is called modula tion PROPORTIONAL PRESSURE CONTR...

Page 9: ...boiler off remove wiring from pressure control on sequencer low voltage terminal board 2 Turn on boiler to supply the voltage to sequencer Short terminal R and B for counter clockwise rotation and ter...

Page 10: ...gized for safety When power resumes the control will re stage the loads one at a time Refer to the diagram for visual description of progressive sequencing PROGRESSIVE SEQUENCING The solid state seque...

Page 11: ...nge 5 Thoroughly clean boiler flange of all foreign material Be certain no part of old gasket remains on boiler flange 6 Apply Slic Tite Gasket Compound or equal to both surfaces of new gasket supplie...

Page 12: ...amp 128 118530 003 Power Circuit Fuse Class J 100 amp 128 118530 004 Valves and Gauges Description Part Number Pressure Gauge 3 1 2 160 344 118529 024 Gauge Glass Assembly 347 118537 002 Sight Glass 3...

Reviews: