MAINTENANCE

RENEWAL PARTS IDENTIFICATION

INSTRUCTIONS FOR ELEMENT REPLACEMENT
CAUTION:

Before installing your new elements, be sure the

McDonnell-Miller low-water cut-off is operating perfectly and the
float chamber and lower equalizer column are completely clear of
sludge or other foreign matter. (See Figure 23)

Failure to do this may cause the immediate burnout of the new ele-

ments.

All elements are thoroughly checked before shipment. The manu-

facturer cannot be responsible for burnouts caused by a faulty low-
water cut-off.

The lower equalizer column can best be examined by breaking the
unions on either side and then visually and manually examining the
piping with your fingers or probes to see if it is clear and clean.

READ COMPLETELY BEFORE STARTING WORK
1.

Disconnect boiler from electric power supply at main safety switch
or fuse panel. Then turn boiler switch to “off” position.

2.

On automatic feed units, close valve on incoming water line. Drain
boiler completely of water.

3.

Open boiler door to expose heating element.

4.

Disconnect wire (electric) leads connecting element to main power
system of boiler. Again note wire connections to facilitate re-
assembly. Proceed to remove (6) 5/16-18 bolts from flange.

5.

Thoroughly clean boiler flange of all foreign material. Be certain
no part of old gasket remains on boiler flange.

6.

Apply “Slic-Tite” Gasket Compound (or equal) to both surfaces of
new gasket supplied with replacement element. Proceed to install
element flange assembly with gasket between boiler flange and
clement flange. In doing this, be careful to align flange holes so
wire connection terminals on element assembly are in line with
previously disconnected wire leads to facilitate easy connections.

7.

When all (6) flange bolts are tight, connect all wires to terminals.
Make certain wires are clean and bright to assure good electrical
contact and nuts on screws are firmly secured.

CAUTION:

Bolts should be lightened 10 a torque of 22 ftlbs.

8.

Open water valve so water supply can reach boiler feed mecha-
nism.

9.

Put main safety switch to “on” position.

10.

Turn boiler switch to “on” position.

11.

As boiler automatically refills, observe the new flange assembly
for possible leaks. If water is noticed, the bolts must be retightened.
Before doing this, turn the boiler off at the main fuse safety switch.

12.

As boiler is heated to working pressure, check flange assembly
again for leaks.

CAUTION - Avoid use of chemical cleaning compounds.
Follow maintenance instructions.

1” Steam Equalizing Pipe

Pump and low water control

Normal Boiler

Water Line

Cut-off Level is
arrow mark

Blowdown
Valve

1” Water equalizing pipe

Figure 23

Summary of Contents for CHS-1080

Page 1: ...t Boilers INSTALLATION CAUTION To avoid electrical shock hazard boilers must be suitably grounded to earth NOTE Chromalox boilers are pre tested before shipment no internal piping or wiring is necessa...

Page 2: ...34 40 2 NPT 1 NPT 1 NPT CHS 720 thru CHS 810 76 58 45 47 94 6 1 1 2 38 44 2 NPT 1 NPT 1 NPT CHS 945 thru CHS 1080 76 68 45 47 94 6 1 1 2 38 44 2 NPT 1 NPT 1 NPT CHS 1215 thru CHS 1620 86 76 56 50 98...

Page 3: ...ety feature that prevents a dangerous situ ation should a contactor or relay stick Activation of the shunt trip device will completely disconnect the boiler from the power sup ply See Figure 7 3 Since...

Page 4: ...Groups To Other Heater Groups Typical 3 Phase Heater Group To Power Curcuit Relay Step Sequencer Figure 9 Power Circuit Detail Low Water Probe 120 Volt Control Voltage Hi Limit Control Electronic Resi...

Page 5: ...he other is used as a high limit control To deter mine the difference in the controls the high limit has a manual reset lever on top of the case Also there is no differential scale present 2 On all co...

Page 6: ...sure Do not push reset until boiler has filled with water The use of chemical boiler cleaning compounds in these boilers voids all warranties unless approved by manufacturer Some compounds will damage...

Page 7: ...ated on the inside of the control panel to boiler normal if the boiler is to be shut down each night Set it to 24 hour duty if the boiler is to remain on continuously 24 hours per day except during bl...

Page 8: ...of the controlled medium will cause a change in the number of elements energized to compensate for it thus keeping the pressure constant This process is called modula tion PROPORTIONAL PRESSURE CONTR...

Page 9: ...boiler off remove wiring from pressure control on sequencer low voltage terminal board 2 Turn on boiler to supply the voltage to sequencer Short terminal R and B for counter clockwise rotation and ter...

Page 10: ...gized for safety When power resumes the control will re stage the loads one at a time Refer to the diagram for visual description of progressive sequencing PROGRESSIVE SEQUENCING The solid state seque...

Page 11: ...nge 5 Thoroughly clean boiler flange of all foreign material Be certain no part of old gasket remains on boiler flange 6 Apply Slic Tite Gasket Compound or equal to both surfaces of new gasket supplie...

Page 12: ...amp 128 118530 003 Power Circuit Fuse Class J 100 amp 128 118530 004 Valves and Gauges Description Part Number Pressure Gauge 3 1 2 160 344 118529 024 Gauge Glass Assembly 347 118537 002 Sight Glass 3...

Reviews: