4. To remove any dirt or dust, wash the air filter.
5. Insert the air filter when dry (do not install when wet) with the airflow indicator facing toward
the projector.
This ensures proper particle filtration.
6. To re-install, align the bottom tabs and follow these steps in reverse order.
Ventilation and Cooling
Vents and louvers provide ventilation, both for intake and exhaust, keeping the projector components
within their operating temperature specifications.
Do not install the projector near a radiator, heat register, or within an enclosure. To ensure adequate
airflow, keep a minimum clearance of 50 cm (20 inches) around the projector and never block or cover
the vents.
When replacing fans, ensure you confirm the fan direction for airflow. The correct orientation of the
fan will also ensure that the fan harness reaches the connector.
Replacing the card cage exhaust fans–bottom (fan #1 and 2)
Fan #1 is located at the bottom of the card cage.
Estimated replacement time: 18 minutes
1. Remove the front top cover (on page 40).
2. Remove the light engine cover (on page 41).
3. Remove the card cage assembly.
4. Remove the two screws securing the fan compartment cover plate to the base.
5. Remove the four screws securing the bottom fan assembly to the base.
6. Cut the cable tie securing the fan harnesses.
7. Removed the required fan(s) and disconnect from inline connector.
8. To re-install, follow these steps in reverse order.
Replacing the radiator fan (fan #3)
Estimated replacement time: 5.5 minutes
1. Remove the front top cover (on page 40).
2. Disconnect the two hoses for the radiator.
Parts and module replacement
Roadie 4K35 and 4K45 Service Manual
46
020-101694-03 Rev. 1 (01-2016)
Copyright
©
2016 Christie Digital Systems USA Inc. All rights reserved.