P 3 5 G P S D u a l L e n s T u r r e t P r o j e c t o r
CHRISTIE INCORPORATED
P35GPS Projector
5-4
June, 1998
1: Inner Belt Tensioner
2: Non-Flanged Idler
3: Upper Sprocket
Pulley
4: Center Sprocket
Pulley
5: Inner Belt Pulley
6: Non-Flanged Idler
7: Shutter Driver
Assembly
8: Screw
9: Single Blade Shutter
Assembly
10: Inner Timing Belt
11: Lower Sprocket
Pulley
12: Changeover Douser
13: Shutter driver
Standoff
Figure 5-3: Inner Timing Belt
5 . 4 . 4 . S
H U T T E R
T
I M I N G
B
E L T
1.
Loosen three Allen head screws securing jackshaft assembly to mainframe (item 5 in
2.
Pull jackshaft assembly down approximately 0.5 inch.
3.
Remove shutter timing belt (item 1 in