Editing a scheduled event
Edit a scheduled event to modify the run time and date.
1. In the left navigation menu, select Scheduler.
2. In the calendar view, select the scheduled event.
3. Select Edit.
4. Edit the scheduled event settings.
5. Select Update Event.
Copying and pasting an existing scheduled
event
To run a scheduled event at a different date and time, copy and paste it.
1. In the left navigation menu, select Scheduler.
2. In the calendar view, select the scheduled event.
3. Select Copy.
4. Select a square below the date and next to the time that you want the event to run.
5. Select Paste.
6. Adjust the any settings for the scheduled event.
7. Select Paste Event.
Copying and pasting scheduled events for an
entire day
To run an existing full day of scheduled events on a different date, copy and paste the entire day of
scheduled events.
1. In the left navigation menu, select Scheduler.
2. At the top of the calendar, select the day with the events you want to copy.
3. Select Copy.
4. At the top of the calendar, select the new target day.
5. Select Paste.
Only unlocked events are copied to the new day.
Cutting and pasting a scheduled event
To move an existing scheduled event to a different date and time, cut and paste it.
1. In the left navigation menu, select Scheduler.
2. In the calendar view, select the scheduled event.
Working with the scheduler
Cinema 4K-RGB User Guide–CP4315-RGB, CP4320-RGB, CP4325-RGB, CP4330-RGB
71
020-102712-06 Rev. 1 (03-2021)
Copyright
©
2021 Christie Digital Systems USA, Inc. All rights reserved.