Chore-Time Hopper 56284 Installation And Operator'S Manual Download Page 5

Installation

5

MF2486A

Switch Adjustment

The Hopper Level Switch is pre-adjusted at the 

factory to a delay of "90" seconds. The delay may be 

changed for a specific installation.
Use the included Small Screw Driver included to 

adjust the switch.

Time Delay Adjustment

•For Less Time: Turn the 

Time

 

Delay 

Adjustment Screw

 counter-clockwise 

(light blinks faster).

•For More Time: Turn the 

Time

 

Delay 

Adjustment Screw

 clockwise. (light 

blinks slower)

Hog Application

In most Hog installations, The Hopper Level Control is located in the Feeder at the end of the Fill System.
Installation is very similar to the Poultry application. Attach the Hopper Level Switch similarly to the Poultry 

application shown in 

“Switch assembly/Installation” on page 3

Safety Timer

Adjustment Screw

Time Delay 
Adjustment Screw

Figure 4.Switch Adjustment

Proximity Sensor

Figure 5.Switch Adjustment

Install Hopper Level Switch in last Feeder.

Summary of Contents for Hopper 56284

Page 1: ...rical Hazard Disconnect electrical power before inspecting or servicing equipment unless maintenance instructions specifically state otherwise Ground all electrical equipment for safety All electrical...

Page 2: ...ch assembly Installation 3 Drop Tube location 3 Switch Location 4 Single Switch Application 4 Multiple Switch Application 4 Switch Adjustment 5 Hog Application 5 Wiring 6 Switch 6 DANGER Electrical Ha...

Page 3: ...x 50 Bolt 1487 3 1 4 20 Nut 751 Drill 9 32 7mm Holes in Hopper Use the Mounting Bracket for a Template 1 Drill 9 32 7mm Holes in Hopper Use Mounting Bracket for a Template 1 2 2 3 Configuration for M...

Page 4: ...ultiple Switch Application Hopper Level Switches may be placed in more than one Hopper to ensure that no Hopper empties before the Control Unit Hopper requires feed All Switches must be wired in paral...

Page 5: ...r For More Time Turn the Time Delay Adjustment Screw clockwise light blinks slower Hog Application In most Hog installations The Hopper Level Control is located in the Feeder at the end of the Fill Sy...

Page 6: ...rwise Ground all electrical equipment for safety All electrical wiring must be done by a qualified electrician in accordance with local and national electric codes Ground all non current carrying meta...

Page 7: ...rt Bracket 42612 10 Danger Decal 2527 35 11 Pan H SFTP 6 32 Screw 35493 12 10 x 5 HXWH Screw 28075 Item Description Part No 13 6 32 x 3 8 Phil Pan H Screw 34660 14 188 x 438 x 051 Washer 149 15 5 x 1...

Page 8: ...anual 34356 Contact your nearby Chore Time distributor or representative for additional parts and information Chore Time Group A division of CTB Inc PO Box 2000 Milford Indiana 46542 2000 USA Phone 57...

Reviews: